How To Fix WRF_PRC_OTB260 - Item &1, schedule line &2; no (active) budget could be determined


WRF_PRC_OTB260 - Overview

  • Message type: E = Error

  • Message class: WRF_PRC_OTB - Purchasing, Open-To-Buy, Seasonal Procurement Messages

  • Message number: 260

  • Message text: Item &1, schedule line &2; no (active) budget could be determined

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


WRF_PRC_OTB260 - Details

  • The SAP error message WRF_PRC_OTB260 indicates that there is no active budget available for a specific item and schedule line in the system. This error typically arises in the context of materials management and procurement processes, particularly when dealing with budget control in SAP.
    
    Cause: Budget Not Defined: The budget for the specific item or schedule line has not been defined in the system. Inactive Budget: The budget that was previously defined is no longer active or has expired. Incorrect Configuration: There may be issues with the configuration of budget control settings in the system. Item or Schedule Line Issues: The item or schedule line may not be correctly set up in the system, leading to the inability to determine the budget. Authorization Issues: The user may not have the necessary authorizations to access the budget information.
    Solution: Check Budget Definition: Verify that a budget has been defined for the relevant item and schedule line. This can be

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


WRF_PRC_OTB260 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker