Message type: E = Error
Message class: WRF_PRC_OTB - Purchasing, Open-To-Buy, Seasonal Procurement Messages
Message number: 260
Message text: Item &1, schedule line &2; no (active) budget could be determined
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
WRF_PRC_OTB260
- Item &1, schedule line &2; no (active) budget could be determined ?The SAP error message WRF_PRC_OTB260 indicates that there is no active budget available for a specific item and schedule line in the system. This error typically arises in the context of materials management and procurement processes, particularly when dealing with budget control in SAP.
Cause:
- Budget Not Defined: The budget for the specific item or schedule line has not been defined in the system.
- Inactive Budget: The budget that was previously defined is no longer active or has expired.
- Incorrect Configuration: There may be issues with the configuration of budget control settings in the system.
- Item or Schedule Line Issues: The item or schedule line may not be correctly set up in the system, leading to the inability to determine the budget.
- Authorization Issues: The user may not have the necessary authorizations to access the budget information.
Solution:
- Check Budget Definition: Verify that a budget has been defined for the relevant item and schedule line. This can be done in the budget management module.
- Activate Budget: If the budget is inactive, you may need to activate it or create a new budget that is valid for the required period.
- Review Configuration: Check the configuration settings for budget control in the system. Ensure that all necessary settings are correctly configured.
- Validate Item and Schedule Line: Ensure that the item and schedule line are correctly set up in the system. Check for any discrepancies or missing information.
- User Authorizations: Confirm that the user has the necessary authorizations to access and view budget information. If not, work with your SAP security team to grant the required permissions.
- Consult Documentation: Refer to SAP documentation or consult with your SAP support team for specific guidance related to your organization's configuration and processes.
Related Information:
CJ20N
(Project Builder) or S_ALR_87013558
(Budget/Actual/Commitment) to review budget information.If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
WRF_PRC_OTB253
Negative contract budget check; processing terminated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WRF_PRC_OTB252
Negative OTB check: processing terminated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WRF_PRC_OTB261
Item &1, schedule line &2: no unique budget could be determined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WRF_PRC_OTB262
Factory calendar for plant &1 could not be determined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...