How To Fix /SAPAPO/PP_OPTIMIZER045 - Resource &1: increase capacity overload is not taken into account


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PP_OPTIMIZER -

  • Message number: 045

  • Message text: Resource &1: increase capacity overload is not taken into account

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PP_OPTIMIZER045 - Resource &1: increase capacity overload is not taken into account ?

    The SAP error message /SAPAPO/PP_OPTIMIZER045 indicates that there is a capacity overload for a specific resource in the Advanced Planning and Optimization (APO) module. This message typically arises during the planning process when the optimizer encounters a situation where the demand for a resource exceeds its available capacity, and the overload is not being considered in the optimization process.

    Cause:

    1. Resource Capacity Settings: The resource in question may have insufficient capacity defined in the system. This could be due to incorrect configuration or changes in production requirements that have not been updated in the system.
    2. Planning Version: The planning version being used may not reflect the latest capacity settings or changes made to the resource.
    3. Overload Handling Settings: The optimizer settings may not be configured to handle overload situations appropriately, leading to the message being triggered.
    4. Resource Allocation: There may be other planning activities or orders that are consuming the resource capacity, leading to an overload situation.

    Solution:

    1. Check Resource Capacity: Review the capacity settings for the resource in question. Ensure that the capacity is defined correctly and is sufficient to meet the demand.
      • Go to the resource master data and verify the capacity settings.
    2. Adjust Planning Parameters: If necessary, adjust the planning parameters to allow for overload handling. This may involve changing the optimizer settings to consider overloads.
    3. Review Planning Version: Ensure that you are using the correct planning version that reflects the latest capacity and demand data.
    4. Analyze Demand and Supply: Check the demand and supply situation for the resource. If there are changes in demand, consider adjusting the production plan or scheduling to better align with available capacity.
    5. Use Alternative Resources: If possible, consider using alternative resources or shifting production to other times when capacity is available.
    6. Consult Documentation: Refer to SAP documentation or notes related to the optimizer and capacity planning for additional guidance on handling overload situations.

    Related Information:

    • Transaction Codes: You may use transaction codes like /SAPAPO/OPTIMIZER to access the optimizer settings and analyze the planning run.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide additional solutions related to this error message.
    • Capacity Planning: Familiarize yourself with capacity planning concepts in SAP APO, including how to define and manage resource capacities effectively.
    • Training and Support: If the issue persists, consider reaching out to SAP support or consulting with an SAP APO expert for further assistance.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error message and ensure that the optimizer can effectively manage resource capacities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant