Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 045
Message text: Resource &1: increase capacity overload is not taken into account
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER045
- Resource &1: increase capacity overload is not taken into account ?The SAP error message /SAPAPO/PP_OPTIMIZER045 indicates that there is a capacity overload for a specific resource in the Advanced Planning and Optimization (APO) module. This message typically arises during the planning process when the optimizer encounters a situation where the demand for a resource exceeds its available capacity, and the overload is not being considered in the optimization process.
Cause: Resource Capacity Settings: The resource in question may have insufficient capacity defined in the system. This could be due to incorrect configuration or changes in production requirements that have not been updated in the system. Planning Version: The planning version being used may not reflect the latest capacity settings or changes made to the resource. Overload Handling Settings: The optimizer settings may not be configured to handle overload situations appropriately, leading to the message being triggered. Resource Allocation: There may be other planning activities or orders that are consuming the resource capacity, leading to an
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PP_OPTIMIZER044
Resource &1: Not available or has no available capacity
What causes this issue? Resource &V1& is not available from &V2& until &V3& or has no available capacity.How to fix this erro...
/SAPAPO/PP_OPTIMIZER043
Resource &1: Overload not taken into account
What causes this issue? Resource &V1& is being loaded with more than its available capacity between bucket &V2& and bucket &V3&am...
/SAPAPO/PP_OPTIMIZER046
Resource &1: No available capacity in time frame &2 to &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PP_OPTIMIZER049
Transportation resource &1: The capacity is not valid
What causes this issue? Transportation resource &V1&: The transportation capacity for each vehicle is &V2&. This value must be greate...
Click on this link to search all SAP messages.