How To Fix /SAPAPO/PP_OPTIMIZER046 - Resource &1: No available capacity in time frame &2 to &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PP_OPTIMIZER -

  • Message number: 046

  • Message text: Resource &1: No available capacity in time frame &2 to &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PP_OPTIMIZER046 - Resource &1: No available capacity in time frame &2 to &3 ?

    The SAP error message /SAPAPO/PP_OPTIMIZER046 indicates that there is no available capacity for a specific resource during a given time frame. This error typically occurs in the context of production planning and optimization within the SAP Advanced Planning and Optimization (APO) module.

    Cause:

    1. Resource Capacity Limitations: The resource specified in the error message has reached its maximum capacity for the specified time frame. This could be due to scheduled maintenance, existing production orders, or other constraints.
    2. Incorrect Capacity Planning: The capacity planning settings for the resource may not be configured correctly, leading to an underestimation of available capacity.
    3. Time Frame Issues: The time frame specified in the error message may not align with the actual availability of the resource, possibly due to incorrect planning or scheduling.
    4. Resource Allocation Conflicts: Other production orders or processes may be using the same resource, leading to conflicts in capacity allocation.

    Solution:

    1. Check Resource Availability: Review the capacity planning for the resource in question. Ensure that the resource is not overbooked and that there is sufficient capacity available for the planned production.
    2. Adjust Production Orders: If possible, reschedule or adjust existing production orders that are using the resource to free up capacity during the specified time frame.
    3. Modify Capacity Settings: If the resource's capacity settings are incorrect, adjust them in the SAP system to reflect the actual available capacity.
    4. Review Maintenance Schedules: Ensure that any planned maintenance or downtime for the resource is accurately reflected in the system and does not conflict with production needs.
    5. Use Alternative Resources: If the primary resource is unavailable, consider using alternative resources that can fulfill the production requirements.
    6. Consult with Production Planners: Collaborate with production planners to understand the constraints and find a feasible solution to the capacity issue.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as /SAPAPO/OPTIMIZER to analyze the optimizer settings or /SAPAPO/RESOURC to check resource details.
    • Capacity Planning: Familiarize yourself with capacity planning concepts in SAP APO, including how to define and manage resource capacities.
    • Production Planning: Understanding the overall production planning process in SAP, including how to manage production orders, scheduling, and resource allocation, can help in resolving such issues.
    • Documentation: Refer to SAP Help documentation for detailed guidance on capacity planning and resource management in SAP APO.

    By following these steps and understanding the underlying causes, you should be able to resolve the error and ensure that your production planning processes run smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.