Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 044
Message text: Resource &1: Not available or has no available capacity
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER044
- Resource &1: Not available or has no available capacity ?The SAP error message
/SAPAPO/PP_OPTIMIZER044
indicates that a specific resource (denoted by&1
) is either not available or does not have any available capacity for the planning period in question. This error typically arises during the planning process in SAP Advanced Planning and Optimization (APO), particularly when using the PP/DS (Production Planning and Detailed Scheduling) optimizer.Causes:
- Resource Not Defined: The resource may not be defined in the system or may not be assigned to the relevant planning area.
- Capacity Constraints: The resource may have been fully booked or may not have any available capacity during the specified time frame.
- Resource Status: The resource might be set to a status that prevents it from being used (e.g., maintenance mode).
- Incorrect Planning Parameters: The planning parameters for the resource may not be set correctly, leading to capacity issues.
- Time Period Issues: The planning horizon may not align with the resource's available capacity, or the time period being planned may be outside the resource's availability.
Solutions:
Check Resource Availability:
- Go to the resource master data and verify that the resource is defined and has the necessary capacity for the planning period.
- Check the capacity planning view to ensure that there is available capacity during the required time frame.
Review Resource Status:
- Ensure that the resource is not in a status that restricts its use (e.g., maintenance or inactive).
- If the resource is under maintenance, consider rescheduling the planning or adjusting the maintenance period.
Adjust Planning Parameters:
- Review and adjust the planning parameters for the resource, including capacity, shifts, and working times.
- Ensure that the resource is correctly assigned to the relevant planning area.
Check Time Periods:
- Verify that the planning horizon is set correctly and that the time periods being planned are within the resource's available capacity.
- Adjust the planning period if necessary.
Capacity Planning:
- If the resource is fully booked, consider rescheduling existing orders or increasing the resource's capacity if feasible.
- Use the capacity leveling functionality in SAP APO to balance the load across available resources.
Related Information:
/SAPAPO/RES01
to view resource availability and /SAPAPO/OPTIMIZER
to run the optimizer.By following these steps, you should be able to identify the root cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER043
Resource &1: Overload not taken into account
What causes this issue? Resource &V1& is being loaded with more than its available capacity between bucket &V2& and bucket &V3&am...
/SAPAPO/PP_OPTIMIZER041
Product &1: No costs are incurred when surplus is destroyed
What causes this issue? No costs are incurred by destroying product &V1& at location &V2& when the maximum storable quantity is excee...
/SAPAPO/PP_OPTIMIZER045
Resource &1: increase capacity overload is not taken into account
What causes this issue? The increase capacity of resource &V1& is being loaded with more than its available capacity between bucket &V2&a...
/SAPAPO/PP_OPTIMIZER046
Resource &1: No available capacity in time frame &2 to &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.