How To Fix /SAPAPO/PP_OPTIMIZER043 - Resource &1: Overload not taken into account


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PP_OPTIMIZER -

  • Message number: 043

  • Message text: Resource &1: Overload not taken into account

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PP_OPTIMIZER043 - Resource &1: Overload not taken into account ?

    The SAP error message /SAPAPO/PP_OPTIMIZER043 indicates that there is an overload situation for a resource in the Advanced Planning and Optimization (APO) module, specifically in the context of the PP (Production Planning) Optimizer. This message typically arises when the optimizer is unable to consider the overload of a resource during the planning process.

    Cause:

    1. Resource Overload: The resource specified in the error message is overloaded, meaning that the planned production exceeds the available capacity of that resource.
    2. Capacity Constraints: The optimizer may not have been configured to take into account certain capacity constraints or overload situations.
    3. Incorrect Resource Settings: The resource may not be set up correctly in terms of its capacity, availability, or other relevant parameters.
    4. Planning Version: The planning version being used may not reflect the current capacity settings or may have outdated data.

    Solution:

    1. Check Resource Capacity: Review the capacity settings for the resource in question. Ensure that the available capacity is correctly defined and that it matches the expected production requirements.
    2. Adjust Production Plans: Modify the production plan to ensure that it does not exceed the available capacity of the resource. This may involve rescheduling production orders or adjusting quantities.
    3. Review Capacity Planning Settings: Ensure that the optimizer is configured to consider overload situations. This may involve checking the settings in the planning book or the optimizer profile.
    4. Use Alternative Resources: If possible, consider using alternative resources that may have available capacity to fulfill the production requirements.
    5. Check for Errors in Master Data: Ensure that the master data for the resource, including its capacity and availability, is accurate and up to date.
    6. Run Capacity Evaluation: Perform a capacity evaluation to identify any potential overloads and adjust the planning accordingly.

    Related Information:

    • Transaction Codes: You may use transaction codes like /SAPAPO/OPTIMIZER to access the optimizer settings or /SAPAPO/CC01 to check capacity planning.
    • Documentation: Refer to SAP Help documentation for detailed information on capacity planning and the optimizer settings.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message or provide updates and patches.
    • Support: If the issue persists, consider reaching out to SAP support for further assistance, providing them with the specific details of the error and the context in which it occurred.

    By following these steps, you should be able to identify the cause of the overload issue and implement a solution to resolve the error message.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author