Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 049
Message text: Transportation resource &1: The capacity is not valid
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER049
- Transportation resource &1: The capacity is not valid ?The SAP error message /SAPAPO/PP_OPTIMIZER049 indicates that there is an issue with the transportation resource's capacity in the Advanced Planning and Optimization (APO) module. Specifically, the message states that the capacity for the specified transportation resource is not valid. Here’s a breakdown of the potential causes, solutions, and related information for this error: Causes: Invalid Capacity Configuration: The transportation resource may not have valid capacity settings defined in the system. This could be due to missing or incorrect data in the resource master record. Capacity Overlap: The defined capacity may overlap with other resources or may not be aligned with the planning period, leading to conflicts. Resource Status: The transportation resource might be set to a status that does not allow it to be used for planning (e.g., inactive or blocked). Planning Version Issues: The planning version being used may not have the correct or updated capacity data for the transportation resource. Time Period Issues: The
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PP_OPTIMIZER046
Resource &1: No available capacity in time frame &2 to &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PP_OPTIMIZER045
Resource &1: increase capacity overload is not taken into account
What causes this issue? The increase capacity of resource &V1& is being loaded with more than its available capacity between bucket &V2&a...
/SAPAPO/PP_OPTIMIZER051
Transportation lane &1: Shipment duration rounded to 0
What causes this issue? The duration of a shipment using transportation lane &V1& has been rounded to 0 days.System Response The transportat...
/SAPAPO/PP_OPTIMIZER052
Transportation lane &1: No products assigned
What causes this issue? Either there are no products that can be transported using transportation lane &V1& or all these products have procur...
Click on this link to search all SAP messages.