Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PDRP_APPR -
Message number: 080
Message text: Depreciation of PR sched. line exceeds allowed value (&1/&2/&3)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PDRP_APPR080
- Depreciation of PR sched. line exceeds allowed value (&1/&2/&3) ?The SAP error message
/SAPAPO/PDRP_APPR080
indicates that the depreciation of a planned order (PR) schedule line exceeds the allowed value. This error typically occurs in the context of Advanced Planning and Optimization (APO) when dealing with production planning and scheduling.Cause:
The error message is triggered when the calculated depreciation for a specific schedule line of a planned order exceeds the predefined limits set in the system. This can happen due to various reasons, such as:
- Incorrect Configuration: The settings for depreciation in the system may not be configured correctly, leading to unrealistic values.
- Data Entry Errors: There may be incorrect data entered for the planned order, such as incorrect quantities or values.
- Business Rules: The business rules defined in the system may not allow for the level of depreciation that is being calculated for the specific schedule line.
- Material Master Data: Issues with the material master data, such as incorrect valuation or costing data, can also lead to this error.
Solution:
To resolve the error, you can take the following steps:
- Check Configuration: Review the configuration settings related to depreciation in the APO system. Ensure that the allowed values for depreciation are set correctly.
- Review Planned Order Data: Check the planned order data for any inconsistencies or errors. Ensure that the quantities and values are entered correctly.
- Adjust Business Rules: If the business rules are too restrictive, consider adjusting them to allow for the necessary depreciation values.
- Material Master Review: Verify the material master data for the affected materials. Ensure that all relevant fields, especially those related to valuation and costing, are correctly maintained.
- Consult Documentation: Refer to SAP documentation or notes related to this specific error message for any additional insights or recommended actions.
- Testing: After making adjustments, test the planned order again to see if the error persists.
Related Information:
/SAPAPO/MD04
(Stock/Requirements List) or /SAPAPO/MD01
(Planning) to analyze the planned orders and their details.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PDRP_APPR079
Depreciation of SA sched. line falls below allowed value (&1/&2/&3)
What causes this issue? Management approval: The quantity specification of a schedule line was reduced and the new value is greater that the maximum ...
/SAPAPO/PDRP_APPR078
No entry for product &1 in found in interchangeability group &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP_APPR081
Depreciation of PO schedule line exceeds allowed value (&1/&2/&3)
What causes this issue? Management approval: The quantity specification of a schedule line was redueced and the new value is greater that the maximum...
/SAPAPO/PDRP_APPR082
No documents relevant to selection could be found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.