Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PDRP_APPR -
Message number: 079
Message text: Depreciation of SA sched. line falls below allowed value (&1/&2/&3)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PDRP_APPR079
- Depreciation of SA sched. line falls below allowed value (&1/&2/&3) ?The SAP error message
/SAPAPO/PDRP_APPR079
indicates that the depreciation of a scheduling agreement (SA) line item has fallen below an allowed value. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with planning and scheduling agreements.Cause:
The error is triggered when the calculated depreciation for a scheduling agreement line item is less than the minimum allowed value defined in the system. This can happen due to various reasons, such as:
- Incorrect Configuration: The allowed depreciation values may not be set correctly in the system configuration.
- Data Entry Errors: There may be incorrect or incomplete data entered for the scheduling agreement or related master data.
- Changes in Demand or Supply: Fluctuations in demand or supply can lead to unexpected depreciation values.
- Planning Parameters: The planning parameters or settings may not align with the business requirements, leading to unrealistic depreciation calculations.
Solution:
To resolve this error, you can take the following steps:
Check Configuration:
- Review the configuration settings for scheduling agreements and ensure that the allowed depreciation values are set correctly.
- Verify the settings in the relevant customizing transactions (e.g., SPRO) related to APO and scheduling agreements.
Review Master Data:
- Check the master data for the scheduling agreement, including material master data, vendor data, and any related planning data.
- Ensure that all necessary fields are filled out correctly and that there are no inconsistencies.
Analyze Planning Parameters:
- Review the planning parameters used in the APO system to ensure they are appropriate for the current business scenario.
- Adjust the parameters if necessary to align with the expected depreciation values.
Check Demand and Supply:
- Analyze the demand and supply situation to understand if there are any significant changes that could affect the depreciation calculations.
- Make adjustments to the planning process if needed.
Consult Documentation:
- Refer to SAP documentation or notes related to this specific error message for additional insights or updates that may address the issue.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They may provide specific notes or patches that can resolve the issue.
Related Information:
/SAPAPO/PDRP
for planning-related activities.By following these steps, you should be able to identify the root cause of the error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PDRP_APPR078
No entry for product &1 in found in interchangeability group &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP_APPR077
More than one interchangeability group found for location &1 product &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP_APPR080
Depreciation of PR sched. line exceeds allowed value (&1/&2/&3)
What causes this issue? Management approval: The quantity specification of a schedule line was reduced and the new value is greater that the maximum ...
/SAPAPO/PDRP_APPR081
Depreciation of PO schedule line exceeds allowed value (&1/&2/&3)
What causes this issue? Management approval: The quantity specification of a schedule line was redueced and the new value is greater that the maximum...
Click on this link to search all SAP messages.