Message type: E = Error
Message class: /SAPAPO/PDRP_APPR -
Message number: 058
Message text: Value of PO schedule line exceeds allowed maximum value (&1/&2/&3)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PDRP_APPR058
- Value of PO schedule line exceeds allowed maximum value (&1/&2/&3) ?The SAP error message /SAPAPO/PDRP_APPR058 indicates that the value of a Purchase Order (PO) schedule line exceeds the allowed maximum value defined in the system. This error typically occurs in the context of Advanced Planning and Optimization (APO) when dealing with demand planning or supply planning scenarios.
Cause: Exceeding Maximum Limits: The error is triggered when the quantity or value of a PO schedule line surpasses the predefined limits set in the system. This could be due to: Incorrect configuration of maximum allowable values for purchase orders in the system. Data entry errors where the user inputs a quantity that is too high. Changes in demand or supply that lead to an unexpected increase in the PO schedule line value. Master Data Issues: There may be issues with the master data related to the material, vendor, or purchasing info records that define the limits. Planning Parameters: The planning parameters set in the APO system may not align
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PDRP_APPR057
Value of PR schedule line exceeds allowed maximum value (&1/&2/&3)
What causes this issue? Management approval: The quantity specification of a schedule line was changed and the new value is greater that the maximum ...
/SAPAPO/PDRP_APPR056
Value of SA delivery sched. line exceeds allowed maximum value (&1/&2/&3)
What causes this issue? Management approval: The quantity specification of a schedule line was changed and the new value is greater that the maximum ...
/SAPAPO/PDRP_APPR059
Manual change: Internal error during comparison with original data
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP_APPR060
User &1 is not assigned to any of the selected location products
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.