Message type: E = Error
Message class: /SAPAPO/PDRP_APPR -
Message number: 059
Message text: Manual change: Internal error during comparison with original data
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PDRP_APPR059
- Manual change: Internal error during comparison with original data ?The SAP error message /SAPAPO/PDRP_APPR059 Manual change: Internal error during comparison with original data typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with the data integrity or consistency during a manual change in the planning book or data view.
Cause: Data Inconsistency: The error may arise due to inconsistencies in the data being compared, such as missing or corrupted records in the database. Locking Issues: If another user or process is accessing or modifying the same data simultaneously, it can lead to conflicts. Custom Code or Enhancements: If there are custom enhancements or user exits that manipulate data during the comparison process, they may introduce errors. System Bugs: There may be bugs in the version of SAP APO you are using that could lead to this error.
Solution: Check Data Integrity: Verify the integrity of the data in the planning book or data view. Look for any missing
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PDRP_APPR058
Value of PO schedule line exceeds allowed maximum value (&1/&2/&3)
What causes this issue? Management approval: The quantity specification of a schedule line was changed and the new value is greater that the maximum ...
/SAPAPO/PDRP_APPR057
Value of PR schedule line exceeds allowed maximum value (&1/&2/&3)
What causes this issue? Management approval: The quantity specification of a schedule line was changed and the new value is greater that the maximum ...
/SAPAPO/PDRP_APPR060
User &1 is not assigned to any of the selected location products
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP_APPR061
An error occurred in the DRP approval
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.