Message type: E = Error
Message class: /SAPAPO/PDRP_APPR -
Message number: 057
Message text: Value of PR schedule line exceeds allowed maximum value (&1/&2/&3)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PDRP_APPR057
- Value of PR schedule line exceeds allowed maximum value (&1/&2/&3) ?The SAP error message
/SAPAPO/PDRP_APPR057
indicates that the value of a planned receipt (PR) schedule line exceeds the allowed maximum value defined in the system. This error typically occurs in the context of Advanced Planning and Optimization (APO) when dealing with demand planning, production planning, or similar processes.Cause:
The error can be caused by several factors, including:
- Configuration Limits: The maximum allowed value for planned receipts may be configured in the system, and the current value exceeds this limit.
- Data Entry Errors: Incorrect data entry during planning or scheduling can lead to values that exceed the allowed limits.
- Master Data Issues: Problems with master data, such as incorrect settings for materials, production versions, or planning parameters, can also lead to this error.
- Planning Strategy: The planning strategy used may impose certain constraints that are not being met by the current planned receipts.
Solution:
To resolve this error, you can take the following steps:
Check Configuration: Review the configuration settings for the maximum allowed values for planned receipts in the relevant planning area. This can typically be found in the APO configuration settings.
Review Planned Receipts: Analyze the planned receipts that are causing the error. Check if they are indeed exceeding the maximum allowed values and identify the source of the excess.
Adjust Values: If the planned receipt values are incorrect, adjust them to fall within the allowed limits. This may involve changing the planning parameters or modifying the demand/supply data.
Master Data Review: Ensure that the master data for the materials involved is correctly set up. This includes checking the material master, production versions, and any relevant planning parameters.
Consult Documentation: Refer to SAP documentation or notes related to this specific error message for additional insights or updates that may address the issue.
Testing: After making adjustments, test the planning run again to ensure that the error does not reoccur.
Related Information:
/SAPAPO/SDP94
(for planning book) or /SAPAPO/MC90
(for planning area) to analyze and adjust the planning data.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PDRP_APPR056
Value of SA delivery sched. line exceeds allowed maximum value (&1/&2/&3)
What causes this issue? Management approval: The quantity specification of a schedule line was changed and the new value is greater that the maximum ...
/SAPAPO/PDRP_APPR055
Limit values for check rules for management approval are not maintained
What causes this issue? Limit values for manual changes (management approval) are not maintained.System Response Checks for management approval are ...
/SAPAPO/PDRP_APPR058
Value of PO schedule line exceeds allowed maximum value (&1/&2/&3)
What causes this issue? Management approval: The quantity specification of a schedule line was changed and the new value is greater that the maximum ...
/SAPAPO/PDRP_APPR059
Manual change: Internal error during comparison with original data
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...