Message type: E = Error
Message class: RU - Messages for order completion confirmation
Message number: 466
Message text: Operation & in sequence & cannot be confirmed by progress confirmation
The selected operation &V1& in sequence &V2& was already automatically
finally confirmed. This happened when a following operation was
manually confirmed by means of a progress confirmation. No further
progress confirmation may take place for the operation selected.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the previous progress confirmation. If necessary, correct the
quantity or the confirmation status.
Error message extract from SAP system. Copyright SAP SE.
RU466
- Operation & in sequence & cannot be confirmed by progress confirmation ?The SAP error message RU466 indicates that an operation in a production order cannot be confirmed because it is not in the correct status or sequence. This typically occurs in the context of production planning and execution, where operations must be confirmed in a specific order.
Cause:
- Incorrect Sequence: The operation you are trying to confirm is not the next operation in the sequence defined in the routing for the production order.
- Status Issues: The production order or the operation may not be in a status that allows confirmation (e.g., it may be in a "blocked" status).
- Missing Predecessor Confirmation: The previous operation in the sequence has not been confirmed yet, which is required before confirming the current operation.
- Routing Changes: Changes in the routing or production order that have not been updated in the system can lead to discrepancies.
Solution:
- Check Operation Sequence: Verify the sequence of operations in the routing for the production order. Ensure that you are confirming the operations in the correct order.
- Confirm Previous Operations: Make sure that all preceding operations have been confirmed before attempting to confirm the current operation.
- Review Order Status: Check the status of the production order and the specific operation. Ensure that they are not blocked or in a status that prevents confirmation.
- Routing Verification: If there have been changes to the routing, ensure that the production order reflects these changes. You may need to reassign the routing or update the order.
- Use Transaction Codes: Utilize transaction codes like CO11N (for confirming operations) or COHV (for mass processing) to manage confirmations effectively.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional insights.
Get instant SAP help. Start your 7-day free trial now.
RU465
Previous operation already finally confirmed
What causes this issue? A predecessor operation was already <ZH>finally confirmed</> using a progress confirmation. The quantity that you...
RU464
& confirmations are processed by other users
What causes this issue? When posting the failed actual cost determinations for confirmations with transaction COFC not all selected items are process...
RU467
Subordinate order in collective order is already finally confirmed
What causes this issue? You create a confirmation that updates operations in a subordinate <ZH>finally confirmed</> order. The quantity t...
RU468
Confirmation procedure & is already active
What causes this issue? The confirmation process &V1& should be carried out for previously marked confirmations. However, this confirmation p...