Message type: E = Error
Message class: REMPT - Message Class for REM Planning Table (Rel. 99)
Message number: 300
Message text: *************** Capacity data / Scheduling
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
REMPT300 - *************** Capacity data / Scheduling ?The SAP error message REMPT300 typically relates to issues with capacity data or scheduling in the context of production planning and control. This error can occur in various scenarios, such as when trying to perform capacity planning, scheduling, or when there are inconsistencies in the data related to work centers, production orders, or routing. Causes of REMPT300 Error Missing or Incomplete Capacity Data: The work center may not have the necessary capacity data defined, such as available capacity, shift definitions, or resource allocation. Incorrect Scheduling Parameters: The scheduling parameters for the production order or work center may not be set correctly, leading to conflicts in capacity planning. Data Inconsistencies: There may be inconsistencies in the master data, such as work centers, production resources, or routing information. Locked or Inactive Work Centers: If a work center is locked or inactive, it may not be able to process capacity requirements. Capacity Overload: The planned capacity may exceed the
Get instant SAP help. Sign up for our Free Essentials Plan.
REMPT289 Run schedule header & is blocked
What causes this issue? The run schedule header you want to call up is currently being processed by another user. Therefore, it is blocked.System Res...
REMPT288 Repetitive mfg not allowed for material & &
What causes this issue? To be able to create run schedule headers for the material &V1&, the following prerequisites must be fulfilled: The i...
REMPT301 Date adjust. level incorrect: Plant &1 / ord.type &2 / prod.sched. &3
What causes this issue? The scheduling level (detailed planning, rate-based planning or sequencing) you selected is not allowed for determining the d...
REMPT302 No lead time scheduling: Plant &1 / order type &2 / prod.sched. &3
What causes this issue? No lead time scheduling is allowed for the scheduling levels you chose for plant &V1&, planned order type &V1&...
Click on this link to search all SAP messages.