Do you have any question about this error?
Message type: E = Error
Message class: REMPT - Message Class for REM Planning Table (Rel. 99)
Message number: 301
Message text: Date adjust. level incorrect: Plant &1 / ord.type &2 / prod.sched. &3
The scheduling level (detailed planning, rate-based planning or
sequencing) you selected is not allowed for determining the dates in
plant &V1&, planned order type &V2& and production scheduler &V3&. The
adjustment of the basic dates and the dependent requirements dates is
carried out via another scheduling level.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please correct the settings for the scheduleing levels in Customizing,
in the IMG step entitled, <DS:SIMG.SIMG_CFMENUOLPKOPU5>Define
Scheduling Parameters for Planned Orders</> or select another
scheduling level in the initial screen.
Error message extract from SAP system. Copyright SAP SE.
REMPT301
- Date adjust. level incorrect: Plant &1 / ord.type &2 / prod.sched. &3 ?The SAP error message REMPT301 indicates that there is an issue with the date adjustment level in the context of production scheduling. This error typically arises in the context of production planning and scheduling when the system encounters inconsistencies in the dates related to a specific plant, order type, or production schedule.
Cause:
The error can be caused by several factors, including:
- Incorrect Date Settings: The date settings for the production order or scheduling might not align with the expected configuration in the system.
- Configuration Issues: There may be a misconfiguration in the production scheduling profiles or parameters that govern how dates are adjusted.
- Master Data Issues: The master data for the plant, order type, or production schedule may be incomplete or incorrect.
- Dependencies and Constraints: There may be dependencies or constraints that are not being met, leading to an inability to adjust dates correctly.
Solution:
To resolve the REMPT301 error, you can take the following steps:
Check Configuration:
- Review the configuration settings for production scheduling in the relevant customizing transactions (e.g., SPRO).
- Ensure that the date adjustment levels are correctly defined for the plant and order type in question.
Review Master Data:
- Verify the master data for the plant, order type, and production schedule. Ensure that all necessary fields are filled out correctly and that there are no inconsistencies.
Analyze the Production Order:
- Check the specific production order associated with the error. Look for any discrepancies in the dates or scheduling parameters.
- Ensure that the order is in a valid status for date adjustments.
Check Dependencies:
- Investigate any dependencies or constraints that may be affecting the scheduling of the production order. This includes checking for linked orders or resource availability.
Consult Documentation:
- Refer to SAP documentation or notes related to production scheduling and the specific error message for additional insights or known issues.
Testing:
- If changes are made to configuration or master data, perform tests to ensure that the error is resolved and that the production scheduling works as expected.
Related Information:
By following these steps, you should be able to identify and resolve the underlying cause of the REMPT301 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
REMPT300
*************** Capacity data / Scheduling
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
REMPT289
Run schedule header & is blocked
What causes this issue? The run schedule header you want to call up is currently being processed by another user. Therefore, it is blocked.System Res...
REMPT302
No lead time scheduling: Plant &1 / order type &2 / prod.sched. &3
What causes this issue? No lead time scheduling is allowed for the scheduling levels you chose for plant &V1&, planned order type &V1&...
REMPT303
No capa. data determined: Plant &1 / Ord. type &2 / Prod. sched. &3
What causes this issue? No capacity planning is allowed for the selected scheduling level for plant &V1&, planned order type &V2& and...
Click on this link to search all SAP messages.