Do you have any question about this error?
Message type: E = Error
Message class: REMPT - Message Class for REM Planning Table (Rel. 99)
Message number: 302
Message text: No lead time scheduling: Plant &1 / order type &2 / prod.sched. &3
No lead time scheduling is allowed for the scheduling levels you chose
for plant &V1&, planned order type &V1& and production scheduler &V3&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please correct the scheduling level settings in Customizing, in the IMG
activity entitled,
<DS:SIMG.SIMG_CFMENUOLPKOPU5>Define Scheduling Parameters for Planned
Orders</> or choose another scheduling level in the initial screen.
Error message extract from SAP system. Copyright SAP SE.
REMPT302
- No lead time scheduling: Plant &1 / order type &2 / prod.sched. &3 ?The SAP error message REMPT302 indicates that there is an issue with lead time scheduling for a specific plant, order type, and production scheduling profile. This error typically arises in the context of production planning and scheduling within SAP, particularly when trying to create or process production orders.
Cause:
The error message "No lead time scheduling" can be caused by several factors, including:
Missing or Incorrect Configuration: The production scheduling profile may not be properly configured for the specified order type or plant. This includes settings related to lead times, scheduling parameters, and production resources.
Order Type Settings: The order type being used may not have lead time scheduling enabled. This can happen if the order type is not set up to allow for scheduling or if it is configured incorrectly.
Plant-Specific Settings: The plant may not have the necessary settings or master data configured to support lead time scheduling. This includes missing or incorrect data in the material master or work center.
Production Scheduling Profile: The production scheduling profile associated with the order type may not be set up to allow for lead time scheduling.
Solution:
To resolve the REMPT302 error, you can take the following steps:
Check Production Scheduling Profile:
- Go to the configuration for the production scheduling profile in SAP (Transaction code: OPU3).
- Ensure that the profile is correctly set up to allow lead time scheduling.
Review Order Type Configuration:
- Check the configuration of the order type in the customizing settings (Transaction code: OPL8).
- Ensure that the order type is configured to allow lead time scheduling.
Verify Plant Settings:
- Check the plant settings in the material master (Transaction code: MM03) and ensure that all necessary data is correctly maintained.
- Review the work center settings (Transaction code: CR01) to ensure that they are properly configured for scheduling.
Check Master Data:
- Ensure that all relevant master data (materials, BOMs, routings) is correctly maintained and that there are no missing components that could affect scheduling.
Consult Documentation:
- Review SAP documentation or help resources for specific details related to lead time scheduling and the configuration of production orders.
Testing:
- After making the necessary changes, test the process again to see if the error persists.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the REMPT302 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
REMPT301
Date adjust. level incorrect: Plant &1 / ord.type &2 / prod.sched. &3
What causes this issue? The scheduling level (detailed planning, rate-based planning or sequencing) you selected is not allowed for determining the d...
REMPT300
*************** Capacity data / Scheduling
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
REMPT303
No capa. data determined: Plant &1 / Ord. type &2 / Prod. sched. &3
What causes this issue? No capacity planning is allowed for the selected scheduling level for plant &V1&, planned order type &V2& and...
REMPT304
No capactiy planning active
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.