Do you have any question about this error?
Message type: E = Error
Message class: REMPT - Message Class for REM Planning Table (Rel. 99)
Message number: 289
Message text: Run schedule header & is blocked
The run schedule header you want to call up is currently being
processed by another user. Therefore, it is blocked.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Try calling up the run schedule header later.
Error message extract from SAP system. Copyright SAP SE.
REMPT289
- Run schedule header & is blocked ?The SAP error message REMPT289, which states "Run schedule header & is blocked," typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with the production planning and scheduling processes. This error indicates that a specific run schedule header is blocked, preventing further processing.
Causes:
- Locked by Another User: The run schedule header may be locked by another user or process, preventing access.
- Incomplete Data: There may be missing or incomplete data in the run schedule header that is causing it to be blocked.
- Status Issues: The status of the run schedule header may not allow for further processing (e.g., it may be set to a status that indicates it is blocked).
- Technical Issues: There could be underlying technical issues, such as database locks or inconsistencies in the data.
Solutions:
- Check Locks: Use transaction code SM12 to check for any locks on the run schedule header. If another user has locked it, you may need to wait until they release the lock or contact them to resolve the issue.
- Review Data: Verify that all necessary data for the run schedule header is complete and correct. Check for any missing fields or incorrect entries.
- Change Status: If the status of the run schedule header is incorrect, you may need to change it to a status that allows processing. This may require specific authorizations.
- Technical Support: If the issue persists, consider reaching out to your SAP Basis or technical support team to investigate any underlying technical issues or database locks.
- Transaction Codes: Use relevant transaction codes (like /SAPAPO/RSPP or /SAPAPO/RSPL) to analyze and manage the run schedule headers.
Related Information:
By following these steps, you should be able to identify the cause of the REMPT289 error and take appropriate action to resolve it.
Get instant SAP help. Start your 7-day free trial now.
REMPT288
Repetitive mfg not allowed for material & &
What causes this issue? To be able to create run schedule headers for the material &V1&, the following prerequisites must be fulfilled: The i...
REMPT287
No valid run schedule header exists in this time
What causes this issue? You entered a material, a production version and a selection key date. However, no valid run schedule header exists for the s...
REMPT300
*************** Capacity data / Scheduling
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
REMPT301
Date adjust. level incorrect: Plant &1 / ord.type &2 / prod.sched. &3
What causes this issue? The scheduling level (detailed planning, rate-based planning or sequencing) you selected is not allowed for determining the d...
Click on this link to search all SAP messages.