Do you have any question about this error?
Message type: E = Error
Message class: PQ - HR-PD: Personnel Development
Message number: 618
Message text: Error delimiting time constraint 1
If time constraint 1 is used for an object, then one valid data record
(and only one) must exist at a given time. Possible causes:
Two validity periods that overlap
A period during which the object is not valid
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check over, and correct the object's validity periods.
Error message extract from SAP system. Copyright SAP SE.
PQ618
- Error delimiting time constraint 1 ?The SAP error message PQ618, which states "Error delimiting time constraint 1," typically occurs in the context of production planning and control, particularly when dealing with the scheduling of operations or resources in a production order or a routing.
Cause:
The error is generally caused by issues related to the time constraints defined for a particular operation or resource. This can happen due to:
- Incorrect Time Constraints: The time constraints for the operation may not be defined correctly, leading to conflicts in scheduling.
- Missing or Incorrect Validity Period: The validity period for the time constraint may not be set properly, or the dates may not align with the production schedule.
- Resource Availability: The resource (machine, labor, etc.) may not be available during the specified time frame, causing a conflict.
- Configuration Issues: There may be configuration issues in the production planning settings that affect how time constraints are interpreted.
Solution:
To resolve the PQ618 error, you can take the following steps:
Check Time Constraints: Review the time constraints defined for the operation or resource in question. Ensure that they are set correctly and do not conflict with other constraints.
Validate Validity Period: Ensure that the validity period for the time constraint is correctly defined and that it aligns with the production order dates.
Resource Availability: Check the availability of the resources involved in the operation. Make sure that they are scheduled correctly and are available during the required time frame.
Review Configuration: If the issue persists, review the configuration settings in the production planning module. Ensure that all settings related to time constraints are correctly configured.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the PQ618 error and related time constraint settings.
Testing: After making changes, test the scheduling again to see if the error is resolved.
Related Information:
CO01
(Create Production Order), CO02
(Change Production Order), or C223
(Define Operation) to access and modify the relevant settings.By following these steps, you should be able to identify and resolve the cause of the PQ618 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
PQ617
Key date is before start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PQ616
Error occurred during deletion
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PQ619
No data found for entries made
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PQ620
Unable to find a qualifications catalog for the root object specified
What causes this issue? A qualifications catalog has not yet been created for this plan version.System Response The system issues an error message a...
Click on this link to search all SAP messages.