Do you have any question about this error?
Message type: E = Error
Message class: PPC0 - Messages for PP Confirmation
Message number: 034
Message text: Attention: Functionality can cause inconsistencies
The function &v1& triggered by you is not a default function. It is
used to eliminate possible inconsistencies.
The use of this function, however, can also cause inconsistencies.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check whether you really need to use this function. If necessary,
discuss it with SAP Development.
Error message extract from SAP system. Copyright SAP SE.
PPC0034
- Attention: Functionality can cause inconsistencies ?The SAP error message PPC0034, which states "Attention: Functionality can cause inconsistencies," typically arises in the context of the Production Planning (PP) module. This message is a warning rather than a critical error, indicating that certain actions or configurations may lead to data inconsistencies within the system.
Cause:
The error message PPC0034 can occur due to several reasons, including:
- Inconsistent Master Data: There may be inconsistencies in the master data, such as material master records, bill of materials (BOM), or routing data.
- Configuration Issues: Incorrect configuration settings in the system can lead to scenarios where the system allows actions that may not be logically consistent.
- Process Flow Violations: Certain processes may be executed in a manner that violates the expected flow, such as creating production orders without proper prerequisites.
- User Actions: Manual interventions or changes made by users that do not align with the standard operating procedures can trigger this warning.
Solution:
To resolve the PPC0034 error message, consider the following steps:
- Review Master Data: Check the relevant master data for inconsistencies. Ensure that all necessary data is correctly maintained and that there are no missing or incorrect entries.
- Check Configuration Settings: Review the configuration settings in the SAP system related to production planning. Ensure that they align with best practices and the specific requirements of your organization.
- Analyze Process Flow: Examine the process flow to ensure that all necessary steps are being followed. If there are deviations, correct them to align with the expected process.
- Consult Documentation: Refer to SAP documentation or notes related to the specific transaction or process you are working with. There may be specific guidelines or recommendations provided by SAP.
- Testing: If changes are made, conduct thorough testing in a development or quality environment before applying them to the production system.
- Seek Expert Help: If the issue persists, consider consulting with an SAP expert or your internal SAP support team for further analysis and resolution.
Related Information:
By following these steps, you should be able to address the PPC0034 error message and minimize the risk of inconsistencies in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
PPC0033
Reporting point for predecessor &1 is not yet confirmed
What causes this issue? You are entering a confirmation with quantity 0. The preceding reporting point &v1& has not been confirmed yet.System...
PPC0032
All confirmations are read in the system
What causes this issue? You have not entered any selection criteria.System Response The system reads all confirmations in the system. The selection ...
PPC0035
Reporting point data is inconsistent
What causes this issue? The reporting points are to be sorted according to their relationships. It was not possible to sort them because the master d...
PPC0036
No output node for order &1
What causes this issue? You want to enter a confirmation for planned order &v1&. However, there is no output node for this order.System Respo...
Click on this link to search all SAP messages.