Do you have any question about this error?
Message type: E = Error
Message class: PPC0 - Messages for PP Confirmation
Message number: 036
Message text: No output node for order &1
You want to enter a confirmation for planned order &v1&. However, there
is no output node for this order.
You cannot enter this confirmation.
Check your master data.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPC0036
- No output node for order &1 ?The SAP error message PPC0036 "No output node for order &1" typically occurs in the context of Production Planning (PP) or related modules when the system is unable to find a valid output node for a specific order. This can happen for various reasons, and understanding the cause is essential for resolving the issue.
Causes:
Missing Output Node Configuration: The output node for the order may not be defined in the system. This can happen if the configuration for the production order or the related master data is incomplete.
Incorrect Order Type: The order type being used may not have the necessary output node settings configured.
Master Data Issues: There may be issues with the master data related to the order, such as missing or incorrect routing, work center, or production version.
System Configuration: The system configuration for the production planning module may not be set up correctly, leading to the inability to determine the output node.
Authorization Issues: Sometimes, the user may not have the necessary authorizations to access the output node configuration.
Solutions:
Check Output Node Configuration:
- Go to the configuration settings for the relevant order type in the SAP system.
- Ensure that the output node is defined correctly for the order type being used.
Review Order Type Settings:
- Verify that the order type has the necessary settings for output nodes.
- Check if the order type is correctly assigned to the relevant production process.
Validate Master Data:
- Review the master data for the production order, including routing, work centers, and production versions.
- Ensure that all necessary data is complete and correctly configured.
Check System Configuration:
- Consult with your SAP Basis or configuration team to ensure that the system settings for production planning are correctly configured.
- Look for any missing or incorrect settings in the configuration.
User Authorizations:
- Ensure that the user has the necessary authorizations to access the output node settings.
- If needed, consult with your security team to review and adjust user roles and permissions.
Related Information:
CO02
(Change Production Order) or CO03
(Display Production Order) to investigate the order details.If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP PP for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PPC0035
Reporting point data is inconsistent
What causes this issue? The reporting points are to be sorted according to their relationships. It was not possible to sort them because the master d...
PPC0034
Attention: Functionality can cause inconsistencies
What causes this issue? The function &v1& triggered by you is not a default function. It is used to eliminate possible inconsistencies. The u...
PPC0037
No unique reporting point with which the goods receipt should occur
What causes this issue? Several reporting points for the order have the characteristic "Post Goods Receipt". In this case, the goods receip...
PPC0038
There is no reporting point at which the goods receipt should occur
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.