Message type: E = Error
Message class:  PPC0 - Messages for PP Confirmation 
Message number: 033
Message text: Reporting point for predecessor &1 is not yet confirmed
You are entering a confirmation with quantity 0. The preceding reporting
point &v1& has not been confirmed yet.
The confirmation cannot be entered.
Enter a confirmation for the preceding reporting point &v1& first.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message PPC0033, which states "Reporting point for predecessor &1 is not yet confirmed," typically occurs in the context of production planning and control, particularly when dealing with production orders and their reporting points.
Cause: This error usually arises when: Predecessor Order Not Confirmed: The predecessor operation or order has not been confirmed yet. In production processes, certain operations must be completed and confirmed before subsequent operations can begin. Missing Confirmation: There may be a missing confirmation for a reporting point that is required for the current operation to proceed. Incorrect Sequence: The operations may not be executed in the correct sequence, leading to dependencies not being met.
Solution: To resolve the PPC0033 error, you can take the following steps: Confirm Predecessor Operations: Check the status of the predecessor operation or order. Ensure that it has been confirmed. You can do this by navigating to the production order and checking the confirmation status. If it has not been
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
PPC0032 All confirmations are read in the system
What causes this issue?  You have not entered any selection criteria.System Response  The system reads all confirmations in the system. The selection ...
PPC0031 &1 &2 have been confirmed already for subsequent reporting point &3
What causes this issue?  In total, &V1& &V2& has been confirmed for the subsequent reporting point &V3& up to now. This quanti...
PPC0034 Attention: Functionality can cause inconsistencies
What causes this issue?  The function &v1& triggered by you is not a default function. It is used to eliminate possible inconsistencies. The u...
PPC0035 Reporting point data is inconsistent
What causes this issue?  The reporting points are to be sorted according to their relationships. It was not possible to sort them because the master d...
Click on this link to search all SAP messages.