Message type: E = Error
Message class: PPC0 - Messages for PP Confirmation
Message number: 031
Message text: &1 &2 have been confirmed already for subsequent reporting point &3
In total, &V1& &V2& has been confirmed for the subsequent reporting
point &V3& up to now.
This quantity is larger than the yield quantity entered currently for
the operation to be confirmed.
Check the quantity entered.
Error message extract from SAP system. Copyright SAP SE.
PPC0031
- &1 &2 have been confirmed already for subsequent reporting point &3 ?The SAP error message PPC0031 indicates that a particular confirmation for a reporting point has already been made, and therefore, it cannot be confirmed again. This error typically arises in the context of production planning and control, particularly when dealing with confirmations in production orders or process orders.
Cause:
The error message PPC0031 occurs due to the following reasons:
- Duplicate Confirmation: The system has detected that the confirmation for the specified reporting point has already been recorded. This can happen if a user attempts to confirm the same operation or reporting point multiple times.
- Incorrect Sequence: The confirmation might be attempted out of the expected sequence, where the system expects a confirmation for a previous reporting point before allowing confirmation for the current one.
- Data Integrity Issues: There may be issues with the data integrity in the production order or process order, leading to inconsistencies in the confirmation process.
Solution:
To resolve the PPC0031 error, you can take the following steps:
Check Existing Confirmations: Review the existing confirmations for the reporting point in question. You can do this by navigating to the relevant production order or process order and checking the confirmation history.
Avoid Duplicate Entries: Ensure that you are not trying to confirm the same reporting point multiple times. If a confirmation has already been made, you may need to adjust your process to reflect that.
Correct Sequence of Confirmations: Make sure that you are confirming the reporting points in the correct order. If you have skipped a reporting point, you may need to confirm that one first before proceeding.
Review Order Status: Check the status of the production order or process order. If the order is completed or closed, you may not be able to make further confirmations.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling confirmations in your version of SAP.
Contact Support: If the issue persists and you cannot identify the cause, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By following these steps, you should be able to address the PPC0031 error effectively.
Get instant SAP help. Start your 7-day free trial now.
PPC0030
Enter the confirmed reporting point
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC0029
Reporting point type &1 for reporting point &2 is not defined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC0032
All confirmations are read in the system
What causes this issue? You have not entered any selection criteria.System Response The system reads all confirmations in the system. The selection ...
PPC0033
Reporting point for predecessor &1 is not yet confirmed
What causes this issue? You are entering a confirmation with quantity 0. The preceding reporting point &v1& has not been confirmed yet.System...
Click on this link to search all SAP messages.