Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPC0030
- Enter the confirmed reporting point ?The SAP error message PPC0030, which states "Enter the confirmed reporting point," typically occurs in the context of Production Planning and Control (PP) or when dealing with production orders and confirmations in SAP. This error indicates that the system requires a confirmed reporting point to proceed with the operation you are trying to execute.
Cause:
The error usually arises due to one of the following reasons:
- Missing Reporting Point: The reporting point for the operation you are trying to confirm has not been defined or is not available in the system.
- Incorrect Configuration: The configuration settings for the production order or the routing may not be set up correctly, leading to the absence of a valid reporting point.
- User Input Error: The user may have overlooked entering the required reporting point during the confirmation process.
Solution:
To resolve the PPC0030 error, you can take the following steps:
Check Reporting Points:
- Navigate to the production order or routing where the error occurred.
- Verify if the reporting points are defined correctly in the routing or production order.
Define Reporting Points:
- If reporting points are missing, you may need to define them in the routing. This can be done in the routing transaction (e.g., CA01 for creating a routing).
- Ensure that the reporting points are correctly assigned to the relevant operations.
Confirm Reporting Point:
- When confirming the operation, ensure that you enter a valid reporting point that exists in the system.
- If you are using a confirmation transaction (e.g., CO11N), make sure to select the correct reporting point from the available options.
Check Configuration:
- Review the configuration settings in the Production Planning module to ensure that everything is set up correctly.
- Consult with your SAP PP consultant if you suspect that there are configuration issues.
User Training:
- Ensure that users are trained on the importance of entering the correct reporting points during the confirmation process.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant for further investigation.
Get instant SAP help. Start your 7-day free trial now.
PPC0029
Reporting point type &1 for reporting point &2 is not defined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC0028
Only the total quantity can be cancelled for the matrix order &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPC0031
&1 &2 have been confirmed already for subsequent reporting point &3
What causes this issue? In total, &V1& &V2& has been confirmed for the subsequent reporting point &V3& up to now. This quanti...
PPC0032
All confirmations are read in the system
What causes this issue? You have not entered any selection criteria.System Response The system reads all confirmations in the system. The selection ...