How To Fix PP_SCH_PRODN047 - No available capacity for all the workcenters


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PP_SCH_PRODN -

  • Message number: 047

  • Message text: No available capacity for all the workcenters

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PP_SCH_PRODN047 - No available capacity for all the workcenters ?

    The SAP error message PP_SCH_PRODN047 indicates that there is no available capacity for all the work centers involved in a production order or planned order. This can occur during the scheduling of production orders when the system cannot find any available capacity to execute the planned operations.

    Causes:

    1. Capacity Overload: The work centers may be overloaded with existing orders, leading to no available capacity for new orders.
    2. Incorrect Capacity Planning: The capacity settings for the work centers may not be configured correctly, such as incorrect available capacity or working times.
    3. Maintenance or Downtime: Scheduled maintenance or unplanned downtimes may reduce the available capacity of the work centers.
    4. Incorrect Order Dates: The production order may have start or finish dates that do not align with the available capacity.
    5. Resource Allocation: Resources may not be allocated correctly, or there may be conflicts in resource availability.
    6. Capacity Constraints: There may be specific constraints set in the system that limit the capacity available for scheduling.

    Solutions:

    1. Check Work Center Capacity:

      • Go to the work center in question and check the capacity planning data. Ensure that the available capacity is set correctly and that there are no unexpected overloads.
    2. Review Existing Orders:

      • Check for existing production orders that are consuming capacity. You may need to reschedule or prioritize orders to free up capacity.
    3. Adjust Scheduling Parameters:

      • Modify the scheduling parameters for the production order, such as changing the start date or adjusting the lead time.
    4. Capacity Planning:

      • If necessary, adjust the capacity planning for the work centers. This may involve increasing the available capacity or changing the working hours.
    5. Check for Maintenance:

      • Verify if there are any maintenance activities scheduled for the work centers that could affect capacity. If so, consider rescheduling the production order.
    6. Use Alternative Work Centers:

      • If possible, consider using alternative work centers that may have available capacity to execute the production order.
    7. Consult with Production Planning:

      • Collaborate with the production planning team to understand the overall production schedule and make necessary adjustments.

    Related Information:

    • Transaction Codes: You can use transaction codes like CM01 (Capacity Planning) or COHV (Mass Processing of Production Orders) to analyze and manage capacity issues.
    • Capacity Evaluation Reports: Utilize reports such as CM21 (Capacity Leveling) to get insights into capacity utilization and identify bottlenecks.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to capacity planning and scheduling.

    By following these steps, you should be able to identify the root cause of the PP_SCH_PRODN047 error and implement a solution to resolve the capacity issue.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages: