How To Fix PP_SCH_PRODN049 - Unable to estimate the capacity as order &1 is already being processed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PP_SCH_PRODN -

  • Message number: 049

  • Message text: Unable to estimate the capacity as order &1 is already being processed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PP_SCH_PRODN049 - Unable to estimate the capacity as order &1 is already being processed ?

    The SAP error message PP_SCH_PRODN049 indicates that the system is unable to estimate the capacity for a production order because the specified order (denoted as &1) is already being processed. This typically occurs in the context of production planning and scheduling within the SAP system.

    Cause:

    1. Order Already in Process: The primary cause of this error is that the production order is currently being processed or is locked by another transaction. This can happen if:

      • The order is being worked on in another session.
      • There is a background job or another user that is currently processing the order.
      • The order is in a status that does not allow for capacity planning (e.g., released, in process).
    2. Lock Mechanism: SAP uses a locking mechanism to prevent multiple users from making changes to the same order simultaneously. If an order is locked, other attempts to access or modify it will result in this error.

    Solution:

    1. Check Order Status: Verify the status of the production order. If it is currently being processed, you may need to wait until the other transaction is completed.

    2. Identify Locking User/Process:

      • Use transaction SM12 to check for locks on the order. You can enter the order number to see if it is locked and by whom.
      • If you find a lock that is no longer needed, you can ask the user to release it or, if necessary, you can delete the lock (be cautious with this approach).
    3. Review Background Jobs: Check if there are any background jobs that might be processing the order. You can use transaction SM37 to view the status of background jobs.

    4. Retry Capacity Planning: Once you have confirmed that the order is not being processed or is no longer locked, you can retry the capacity estimation.

    5. Consult Documentation: If the issue persists, consult SAP documentation or your internal SAP support team for further troubleshooting steps.

    Related Information:

    • Transaction Codes:

      • SM12: To view and manage locks.
      • SM37: To monitor background jobs.
      • CO02: To change production orders.
      • CO03: To display production orders.
    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.

    • User Training: Ensure that users are trained on how to properly manage production orders to avoid conflicts and locks.

    By following these steps, you should be able to resolve the PP_SCH_PRODN049 error and continue with your production planning activities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker