Do you have any question about this error?
Message type: E = Error
Message class: PP_SCH_PRODN -
Message number: 048
Message text: Workcenter &1 in Plant &2 does not have capacity
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PP_SCH_PRODN048
- Workcenter &1 in Plant &2 does not have capacity ?The SAP error message PP_SCH_PRODN048 indicates that a specific work center in a given plant does not have any capacity available for production scheduling. This can occur in various scenarios, particularly when trying to create or schedule production orders.
Cause:
- No Capacity Defined: The work center may not have any capacity defined for the relevant time period.
- Capacity Overload: The work center might be overloaded with existing orders, leaving no available capacity for new orders.
- Capacity Planning Settings: The capacity planning settings for the work center may not be configured correctly.
- Calendar Issues: The work center's calendar may not be set up properly, leading to no available working days or hours.
- Incorrect Plant or Work Center Assignment: The production order may be incorrectly assigned to a work center that is not valid for the specified plant.
Solution:
Check Work Center Capacity:
- Go to the work center in transaction CR02 (Change Work Center) and verify that capacity is defined for the relevant period.
- Ensure that the capacity is sufficient to handle the production orders.
Review Existing Orders:
- Check for existing production orders or planned orders that may be consuming the available capacity. You can use transaction CO03 (Display Production Order) to review existing orders.
Adjust Capacity Planning:
- If necessary, adjust the capacity planning settings for the work center. This can include increasing the available capacity or adjusting the scheduling parameters.
Check Work Center Calendar:
- Verify the work center calendar settings to ensure that the work center is available for production during the required time frame. You can check this in the work center configuration.
Validate Plant and Work Center Assignment:
- Ensure that the production order is assigned to the correct work center and plant. You can check this in the order details.
Capacity Evaluation:
- Use transaction CM01 (Capacity Evaluation) to analyze the capacity situation for the work center and identify any overloads or issues.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PP_SCH_PRODN047
No available capacity for all the workcenters
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN046
Order &1 could not be scheduled due to a technical error.
Order <(>&<)>1 could not be scheduled due to a technical error. Extend the horizon and try again.Error message extract from SAP syste...
PP_SCH_PRODN049
Unable to estimate the capacity as order &1 is already being processed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN050
Order &1 is firmed.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.