Do you have any question about this error?
Message type: E = Error
Message class: PP_SCH_PRODN -
Message number: 046
Message text: Order &1 could not be scheduled due to a technical error.
Error message extract from SAP system. Copyright SAP SE.
PP_SCH_PRODN046
- Order &1 could not be scheduled due to a technical error. ?The SAP error message PP_SCH_PRODN046 indicates that a production order (identified by &1) could not be scheduled due to a technical error. This error can arise from various underlying issues, and resolving it typically involves a systematic approach to identify and fix the root cause. Here are some common causes, potential solutions, and related information:
Common Causes:
- Missing Master Data: Required master data such as material master, routing, or work center may be incomplete or missing.
- Capacity Issues: The work center may not have sufficient capacity available for the scheduled time.
- Configuration Errors: Incorrect configuration in the production planning settings or scheduling parameters.
- System Performance Issues: Technical issues related to system performance, such as database locks or memory issues.
- Invalid Dates: The dates specified in the production order may be invalid or outside the permissible range.
- Dependencies and Constraints: There may be dependencies or constraints that prevent the order from being scheduled.
Potential Solutions:
Check Master Data:
- Verify that all necessary master data (material, routing, work center) is complete and correctly configured.
- Ensure that the production version is correctly assigned to the material.
Review Capacity Planning:
- Check the capacity of the work center to ensure it can handle the load for the scheduled period.
- Adjust the capacity or reschedule the order if necessary.
Analyze Scheduling Parameters:
- Review the scheduling parameters in the production planning configuration to ensure they are set correctly.
- Check for any custom settings that may affect scheduling.
Check for System Issues:
- Look for any system performance issues, such as database locks or memory shortages.
- Consult with your IT department or SAP Basis team to investigate any technical problems.
Validate Dates:
- Ensure that the start and finish dates of the production order are valid and within the acceptable range.
- Adjust the dates if they are incorrect.
Review Dependencies:
- Check for any dependencies or constraints that may be affecting the scheduling of the order.
- Resolve any conflicts that may exist.
Related Information:
If the issue persists after trying the above solutions, it may be necessary to engage SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PP_SCH_PRODN045
Extend the horizon and try again.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN044
Unable to realign the schedule of order &1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN047
No available capacity for all the workcenters
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP_SCH_PRODN048
Workcenter &1 in Plant &2 does not have capacity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.