How To Fix PP_SCH_PRODN045 - Extend the horizon and try again.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PP_SCH_PRODN -

  • Message number: 045

  • Message text: Extend the horizon and try again.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PP_SCH_PRODN045 - Extend the horizon and try again. ?

    The SAP error message PP_SCH_PRODN045 typically indicates that the production scheduling horizon is not sufficient to accommodate the planned production activities. This error often arises in the context of production planning and scheduling when the system cannot find a suitable time frame to schedule the production orders or operations.

    Cause:

    1. Insufficient Scheduling Horizon: The scheduling horizon defined in the system is too short to include the production orders or operations that need to be scheduled.
    2. Configuration Issues: The settings in the production planning module may not be configured correctly, leading to limitations in scheduling.
    3. Master Data Issues: Problems with master data, such as incorrect lead times, production versions, or resource availability, can also contribute to this error.
    4. Capacity Constraints: If the production resources (machines, labor, etc.) are fully booked or have limited availability, it may not be possible to schedule new production orders within the existing horizon.

    Solution:

    1. Extend the Scheduling Horizon:

      • Go to the configuration settings in SAP and increase the scheduling horizon. This can typically be done in the production planning settings (transaction code: SPRO).
      • Look for settings related to "Scheduling" or "Production Planning" and adjust the parameters to extend the horizon.
    2. Check Master Data:

      • Review the master data for the materials and resources involved in the production process. Ensure that lead times, production versions, and resource availability are correctly defined.
      • Make sure that the production versions are active and correctly assigned to the materials.
    3. Review Capacity Planning:

      • Check the capacity planning for the resources involved. Ensure that there are no capacity constraints that would prevent scheduling.
      • If necessary, adjust the capacity or reschedule existing orders to free up resources.
    4. Re-run the Planning Process:

      • After making the necessary adjustments, re-run the planning process (e.g., MRP run) to see if the error persists.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on the PP_SCH_PRODN045 error and related configuration settings.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MD01 (MRP Run), CO01 (Create Production Order), and CO02 (Change Production Order) for managing production orders.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Forums: Engage with SAP community forums or user groups for additional insights and solutions from other users who may have encountered similar issues.

    By following these steps, you should be able to resolve the PP_SCH_PRODN045 error and successfully schedule your production activities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant