How To Fix PP_SCH_PRODN045 - Extend the horizon and try again.


PP_SCH_PRODN045 - Overview

  • Message type: E = Error

  • Message class: PP_SCH_PRODN -

  • Message number: 045

  • Message text: Extend the horizon and try again.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PP_SCH_PRODN045 - Extend the horizon and try again. ?
    The SAP error message PP_SCH_PRODN045 typically indicates that the production scheduling horizon is not sufficient to accommodate the planned production activities. This error often arises in the context of production planning and scheduling when the system cannot find a suitable time frame to schedule the production orders or operations.
    
    Cause: Insufficient Scheduling Horizon: The scheduling horizon defined in the system is too short to include the production orders or operations that need to be scheduled.
    Configuration Issues: The settings in the production planning module may not be configured correctly, leading to limitations in scheduling. Master Data Issues: Problems with master data, such as incorrect lead times, production versions, or resource availability, can also contribute to this error. Capacity Constraints: If the production resources (machines, labor, etc.) are fully booked or have limited availability, it may not be possible to schedule new production orders within the existing horizon.
    Solution: Extend the Scheduling Horizon: Go to the configuration settings in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant