Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 191
Message text: No suitable replenishment strategy
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please maintain the replenishment strategies for Kanban
control cycles in Kanban Customizing, or maintain the Kanban-independent
control cycles in Customizing for JIT inbound.
Error message extract from SAP system. Copyright SAP SE.
PK191
- No suitable replenishment strategy ?The SAP error message PK191, which states "No suitable replenishment strategy," typically occurs in the context of inventory management and material requirements planning (MRP) within SAP. This error indicates that the system could not find a valid replenishment strategy for a particular material or location. Causes: Missing Replenishment Strategy: The material may not have a defined replenishment strategy in the material master data. Incorrect Configuration: The configuration settings for the replenishment strategies may not be set up correctly in the system. Material Status: The material might be blocked or have a status that prevents it from being replenished. Location Issues: The storage location or plant may not be properly defined or may not have the necessary settings for replenishment. Planning Parameters: The planning parameters for the material may not be set correctly, leading to the system being unable to determine a suitable strategy. Solutions: Check Material Master Data: Go to the material master record (transaction code MM03) and check
Get instant SAP help. Sign up for our Free Essentials Plan.
PK190
Select strategy for Kanban control with MRP
What causes this issue? Only the replenishment strategies that specify that material flow is controlled via the Kanban are allowed. Replenishment (fo...
PK189
Select strategy for storage location that is not included in MRP
What causes this issue? Only the strategies that specify that material flow is controlled via the kanban and that cause the creation of the replenish...
PK192
Strategy not allowed for stge location that is included in planning
What causes this issue? Only the strategies that specify that material flow is controlled via the kanban and that cause the creation of the replenish...
PK193
Strategy not allowed for stge location that is not included in planning
What causes this issue? In the strategy selected, material flow is controlled by the kanban. Replenishment (for example, run schedule quantities or p...
Click on this link to search all SAP messages.