Do you have any question about this error?
Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 190
Message text: Select strategy for Kanban control with MRP
Only the replenishment strategies that specify that material flow is
controlled via the Kanban are allowed. Replenishment (for example, run
schedule quantities or purchase orders) is planned in the planning run.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PK190
- Select strategy for Kanban control with MRP ?The SAP error message PK190, which states "Select strategy for Kanban control with MRP," typically occurs in the context of Kanban management within the SAP system, particularly when using Material Requirements Planning (MRP) in conjunction with Kanban.
Cause:
The error message PK190 is usually triggered when the system cannot find a suitable strategy for managing Kanban control in the context of MRP. This can happen due to several reasons:
Missing Configuration: The strategy for Kanban control may not be defined in the system. This could be due to missing settings in the configuration of the material master or the Kanban control cycle.
Incorrect Material Master Settings: The material master record may not have the necessary settings for MRP and Kanban, such as the MRP type or the control parameters.
Inconsistent Data: There may be inconsistencies in the data related to the Kanban control cycle or the MRP settings.
Missing Control Parameters: The control parameters for the Kanban process may not be set up correctly, leading to the inability to select a strategy.
Solution:
To resolve the PK190 error, you can follow these steps:
Check Material Master Settings:
- Go to the material master record (transaction code MM03) and check the MRP views.
- Ensure that the MRP type is set correctly (e.g., "K" for Kanban).
- Verify that the relevant fields for Kanban control are filled out correctly.
Review Kanban Control Cycle:
- Check the Kanban control cycle settings (transaction code PKMC) to ensure that the control parameters are defined.
- Make sure that the control cycle is active and properly linked to the material.
Define Strategy:
- If no strategy is defined, you may need to define a new strategy for Kanban control in the configuration settings (transaction code SPRO).
- Navigate to the relevant configuration path: Logistics > Production > KANBAN > Control > Define Control Parameters.
Check MRP Configuration:
- Ensure that the MRP configuration is set up correctly for the use of Kanban. This includes checking the settings for MRP areas and planning strategies.
Consult Documentation:
- Review SAP documentation or help files related to Kanban and MRP for any additional configuration steps that may be required.
Testing:
- After making the necessary changes, test the Kanban process again to see if the error persists.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the PK190 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
PK189
Select strategy for storage location that is not included in MRP
What causes this issue? Only the strategies that specify that material flow is controlled via the kanban and that cause the creation of the replenish...
PK188
Control cycle number does not match material, plant, supply area
What causes this issue? You have entered the control cycle number as well as data in the material, plant, and supply area fields to determine the con...
PK191
No suitable replenishment strategy
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
PK192
Strategy not allowed for stge location that is included in planning
What causes this issue? Only the strategies that specify that material flow is controlled via the kanban and that cause the creation of the replenish...