Do you have any question about this error?
Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 189
Message text: Select strategy for storage location that is not included in MRP
Only the strategies that specify that material flow is controlled via
the kanban and that cause the creation of the replenishment (for
example, creation of run schedule quantities or purchase orders) are
allowed.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PK189
- Select strategy for storage location that is not included in MRP ?The SAP error message PK189 indicates that there is an issue with the selection strategy for a storage location that is not included in the Material Requirements Planning (MRP) process. This typically occurs when you are trying to perform a planning run or a related function, and the system cannot find a valid strategy for the specified storage location.
Cause:
- Storage Location Not Included in MRP: The storage location you are trying to use is not set up to be included in the MRP process. This means that the system does not have any planning strategies defined for that location.
- Incorrect Configuration: The configuration settings for the material or storage location may not be properly set up, leading to the system not recognizing it during planning.
- Master Data Issues: There may be issues with the material master data or the configuration of the storage location that prevent it from being included in MRP.
Solution:
Check MRP Settings:
- Go to the material master record (transaction code MM03) and check the MRP views for the material in question.
- Ensure that the storage location is included in the MRP settings. You can do this by checking the MRP type and ensuring that the storage location is set up correctly.
Adjust Storage Location Settings:
- If the storage location should be included in MRP, you may need to adjust the settings in the configuration. This can be done in the customizing settings (transaction code SPRO) under:
- Logistics -> Production -> Material Requirements Planning -> Master Data -> Define MRP Areas.
- Ensure that the storage location is defined as an MRP area if necessary.
Review Planning Strategies:
- Check the planning strategies assigned to the material and ensure that they are appropriate for the storage location. You can do this in the material master under the MRP view.
Consult Documentation:
- Review SAP documentation or help files related to MRP and storage location settings for further guidance on how to configure these settings correctly.
Testing:
- After making the necessary changes, perform a test run of the MRP process to ensure that the error does not occur again.
Related Information:
By following these steps, you should be able to resolve the PK189 error and ensure that your storage location is properly included in the MRP process.
Get instant SAP help. Start your 7-day free trial now.
PK188
Control cycle number does not match material, plant, supply area
What causes this issue? You have entered the control cycle number as well as data in the material, plant, and supply area fields to determine the con...
PK187
GR for the full kanban container has not yet been made
What causes this issue? The goods receipt for the kanban container is posted separately from the kanban status, as the indicator 'separate GR...
PK190
Select strategy for Kanban control with MRP
What causes this issue? Only the replenishment strategies that specify that material flow is controlled via the Kanban are allowed. Replenishment (fo...
PK191
No suitable replenishment strategy
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
Click on this link to search all SAP messages.