Do you have any question about this error?
Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 193
Message text: Strategy not allowed for stge location that is not included in planning
In the strategy selected, material flow is controlled by the kanban.
Replenishment (for example, run schedule quantities or purchase orders)
is planned in the planning run. This strategy is only allowed if the
material in the storage location allocated to the supply area is
included in the planning run.
Either select another strategy or change the MRP type of the material in
the MRP area so that it is included in planning. Alternatively, you can
delete the assignment to the MRP area.
Error message extract from SAP system. Copyright SAP SE.
PK193
- Strategy not allowed for stge location that is not included in planning ?The SAP error message PK193 ("Strategy not allowed for storage location that is not included in planning") typically occurs in the context of production planning and inventory management. This error indicates that a specific storage location is not included in the planning process for the material or product you are trying to work with, and therefore, the strategy you are attempting to use is not applicable.
Cause:
- Storage Location Not Included in Planning: The storage location you are trying to use is not set up for planning in the material master or in the relevant configuration settings.
- Incorrect Strategy: The strategy you are trying to apply (e.g., MRP strategy) is not compatible with the storage location settings.
- Material Master Settings: The material master data may not be correctly configured for the storage location in question.
Solution:
Check Material Master Settings:
- Go to the material master record (transaction code MM03) and check the planning view for the relevant storage location.
- Ensure that the storage location is included in the planning parameters.
Review MRP Settings:
- Check the MRP settings for the material (transaction code MD03) and ensure that the storage location is included in the planning run.
- Make sure that the MRP type and strategy are appropriate for the storage location.
Adjust Storage Location Configuration:
- If the storage location should be included in planning, you may need to adjust the configuration settings in the customizing (transaction code SPRO).
- Navigate to the relevant sections for MRP and ensure that the storage location is set up correctly.
Change Strategy:
- If the strategy you are trying to use is not appropriate for the storage location, consider changing the strategy to one that is compatible.
Consult Documentation:
- Review SAP documentation or help resources for specific details on the planning strategies and their requirements.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and inventory management.
Get instant SAP help. Start your 7-day free trial now.
PK192
Strategy not allowed for stge location that is included in planning
What causes this issue? Only the strategies that specify that material flow is controlled via the kanban and that cause the creation of the replenish...
PK191
No suitable replenishment strategy
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
PK194
Source storage location must differ from supply area's storage location
CAUSE& The supply area for which you want to trigger replenishment has been assigned to a storage location. However, you cannot trigger replenish...
PK195
Issuing plant must differ from the receiving plant
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...