Do you have any question about this error?
Message type: E = Error
Message class: NAA - Subsequent settlement (Purchasing)
Message number: 699
Message text: Worklist processing cancelled due to timeout
The worklist processing was cancelled, as the finish date that was
specified has passed.
&V1& rebate arrangements were processed. Error messages occurred in
&V2& rebate arrangements.
The processing was cancelled. However, not all rebate arrangements were
processed. Remaining rebate arrangements do not have status
"completed".
Start the worklist processing again to process the missing rebate
arrangements.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
NAA699
- Worklist processing cancelled due to timeout ?The SAP error message NAA699, which indicates that "Worklist processing cancelled due to timeout," typically occurs when a worklist processing operation takes longer than the allowed time limit set in the system. This can happen in various scenarios, such as when processing large volumes of data or when the system is under heavy load.
Causes:
- Long Processing Time: The operation may be taking too long due to the volume of data being processed or complex logic in the worklist.
- System Performance Issues: High system load or insufficient resources (CPU, memory, etc.) can lead to delays in processing.
- Timeout Settings: The timeout settings for the worklist processing may be configured too low for the operations being performed.
- Database Performance: Slow database queries or locks can also contribute to longer processing times.
Solutions:
- Increase Timeout Settings: If possible, adjust the timeout settings for worklist processing in the SAP system configuration. This can often be done in transaction codes like
RZ10
orRZ11
, depending on the specific settings you need to change.- Optimize Worklist Processing:
- Review the logic and data being processed to identify any inefficiencies.
- Consider breaking down large worklists into smaller batches if applicable.
- Monitor System Performance: Use transaction codes like
ST03N
orSM66
to monitor system performance and identify any bottlenecks.- Database Optimization: Ensure that the database is optimized, including proper indexing and regular maintenance tasks.
- Check for Locks: Use transaction
SM12
to check for any locks that might be affecting performance.- Consult SAP Notes: Check the SAP Support Portal for any relevant notes or patches that may address this issue.
Related Information:
SM37
(Job Monitoring), ST22
(Dump Analysis), and SM21
(System Log) to gather more information about the error context.By addressing the underlying causes and optimizing the system, you can reduce the likelihood of encountering the NAA699 error in the future.
Get instant SAP help. Start your 7-day free trial now.
NAA698
There is no billing document UoM for item &2 in customer settlement &1
What causes this issue? There is no billing unit of measure for item &V2& in customer settlement &V1&. Customer settlements - dependi...
NAA697
There is no billing document UoM for item &2 in settlement document &1
What causes this issue? There is no billing unit of measure for item &V2& in settlement document &V1&. Settlement documents - dependi...
NAA700
Reverse document &1 individually using transaction MR08
What causes this issue? Reversal of settlement runs is no longer supported for credit memos.System Response The document is not reversed.How to fix ...
NAA701
Supplier billing doc &1 for arrangement &2 was reversed successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.