Do you have any question about this error?
Message type: E = Error
Message class: HRPFD00 - HR-PF: International Pension Fund
Message number: 620
Message text: The lock date cannot lie before the start date.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
HRPFD00620
- The lock date cannot lie before the start date. ?The SAP error message HRPFD00620, "The lock date cannot lie before the start date," typically occurs in the context of personnel administration or organizational management when there is an attempt to set a lock date that is earlier than the start date of a personnel action or an organizational unit.
Cause:
- Incorrect Date Entry: The lock date you are trying to set is earlier than the start date of the relevant personnel action or organizational unit.
- Configuration Issues: There may be configuration settings in the system that enforce date constraints which are not being adhered to.
- Data Integrity Issues: There might be inconsistencies in the data that lead to this error, such as incorrect or missing start dates.
Solution:
- Check Dates: Verify the start date of the personnel action or organizational unit. Ensure that the lock date you are trying to set is on or after this start date.
- Adjust Lock Date: If the lock date is indeed earlier than the start date, adjust the lock date to a valid date that is equal to or later than the start date.
- Review Configuration: If you believe the dates are correct, review the configuration settings in the system to ensure that there are no constraints that are causing this issue.
- Data Consistency Check: Run a data consistency check to identify any discrepancies in the personnel data that might be causing the error.
- Consult Documentation: Refer to SAP documentation or help resources for any specific guidelines related to the personnel actions you are working with.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide deeper insights into the specific configuration and data setup in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
HRPFD00619
Account will be delimited if it coincides with other accounts.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
HRPFD00618
Account &1 was delimited and the personnel number assignment adjusted
What causes this issue? The account's start / end date has been changed. In some cases the time period of personnel number assignments was adjus...
HRPFD00621
Value type &1 is not permitted for manual bookings in plan &2.
What causes this issue? You are trying to create a posting with value type &V1& that refers to the current processing plan &V2& and i...
HRPFD00622
Posting date is not within validity period of account.
What causes this issue? The posting date &V1& is not in the validity period (&V2& to &V3&) for current account &V4&.S...
Click on this link to search all SAP messages.