Do you have any question about this error?
Message type: E = Error
Message class: GMAVC - Message class for Grant Management AVC
Message number: 050
Message text: *** Messages for checks on incoming amounts, annual period:
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
GMAVC050
- *** Messages for checks on incoming amounts, annual period: ?The SAP error message GMAVC050 typically relates to issues with budget availability control in the context of the SAP Public Sector or SAP Controlling (CO) modules. This error indicates that there are checks on incoming amounts that are not being met, which can occur during various financial transactions, such as posting a journal entry or processing a budget.
Cause:
- Budget Availability Control: The error often arises when the system checks the availability of budget funds against the incoming amounts and finds that the budget is either insufficient or not properly configured.
- Incorrect Configuration: There may be issues with the configuration of the budgetary control settings, such as the budget period, budget type, or the assignment of funds.
- Posting Period Issues: The error can also occur if the posting period is closed or if the transaction is being attempted in a period that is not open for posting.
- Incorrect Amounts: The amounts being posted may exceed the available budget or may not align with the expected values for the specified period.
Solution:
- Check Budget Availability: Review the budget availability for the relevant cost center, fund, or project to ensure that there are sufficient funds to cover the incoming amounts.
- Review Configuration: Ensure that the budgetary control settings are correctly configured in the system. This includes checking the budget types, availability control settings, and any related parameters.
- Open Posting Period: Verify that the posting period is open for the transaction you are trying to execute. If the period is closed, you may need to open it or post the transaction in an open period.
- Adjust Amounts: If the amounts being posted exceed the available budget, consider adjusting the amounts or reallocating funds to ensure compliance with budgetary constraints.
- Consult Documentation: Refer to SAP documentation or consult with your SAP support team for specific guidance related to your organization's configuration and policies.
Related Information:
FMAVCR01
(to check budget availability) or FMBB
(to post budget adjustments) to help diagnose and resolve the issue.If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
GMAVC019
Overall budget of &2 almost exhausted for several document items
What causes this issue? The current budget consumption is &V2& less than the overall budget for several document items from item &V1&...
GMAVC018
Overall budget exceeded by &2 for several document items from item &1 on
What causes this issue? The overall budget is exceeded by &V2& for several document items from item &V1& onward. Availability control...
GMAVC051
Annual budget of &2 exhausted for &1
What causes this issue? The annual budget of the availability control ledger &V2& has been consumed for the GM account assignment &V1&...
GMAVC052
Annual budget exceeded by &2 for &1
What causes this issue? The annual budget is exceeded by &V2& for the GM account assignment &V1& . Availability control on incoming a...
Click on this link to search all SAP messages.