Message type: E = Error
Message class: DPR_SHARED - Development Projects: Messages for Shared Objects
Message number: 210
Message text: You require authorization to schedule &1 '&2'
You do not have sufficient authorization to carry out scheduling for
&V1& '&V2&'.
The system does not carry out scheduling.
In order to be able to carry out scheduling you require authorization
to administrate project elements. The project leader must grant you
this authorization.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
DPR_SHARED210
- You require authorization to schedule &1 '&2' ?The SAP error message DPR_SHARED210 indicates that a user does not have the necessary authorization to schedule a specific task or project in the SAP system. This error typically occurs in the context of SAP Project Management or SAP Portfolio and Project Management (PPM) when a user attempts to schedule a project or task but lacks the required permissions.
Cause:
The primary cause of this error is a lack of authorization for the user role attempting to perform the scheduling action. This can happen due to:
- Missing Authorization Objects: The user’s role may not include the necessary authorization objects related to project scheduling.
- Role Configuration: The roles assigned to the user may not be properly configured to allow scheduling actions.
- User Profile Issues: The user profile may not be updated with the correct roles or permissions.
Solution:
To resolve the DPR_SHARED210 error, you can take the following steps:
Check User Authorizations:
- Use transaction code
SU53
immediately after the error occurs to analyze the authorization check. This will show which authorization objects are missing.- Review the user’s roles and authorizations in transaction
SU01
(User Maintenance) orPFCG
(Role Maintenance).Modify Roles:
- If you have the necessary permissions, modify the user’s role to include the required authorization objects. Common authorization objects related to project scheduling include:
C_PROJ
(Project Management)C_PRC
(Project Control)- Ensure that the user has the necessary activity authorizations (e.g., create, change, display).
Consult with Security Team:
- If you do not have the necessary access to modify roles, contact your SAP security or basis team. Provide them with the details of the error and the user’s role to assist in troubleshooting.
Testing:
- After making changes to the user’s roles or authorizations, have the user log out and log back in to ensure that the changes take effect. Then, attempt to schedule the task again.
Related Information:
By following these steps, you should be able to resolve the DPR_SHARED210 error and enable the user to schedule the project or task successfully.
Get instant SAP help. Start your 7-day free trial now.
DPR_SHARED209
You cannot change &1 '&2'
What causes this issue? &V1& '&V2&' is opened in display mode only, or its status does not allow you to make changes.System...
DPR_SHARED208
&1 &2: Dates are outside the validity period of the calendar
What causes this issue? If you schedule &V1& '&V2&', it would have dates that lie outside of the validity period of the cal...
DPR_SHARED211
&1 &2: Start constraint conflicts with determined start
What causes this issue? A constraint is set for the start of the project element. In forward scheduling, the system calculates the start (earliest st...
DPR_SHARED212
&1 &2: Finish constraint conflicts with determined finish
What causes this issue? A constraint is set for the finish of the project element. In backward scheduling, the system calculates the finish (latest f...
Click on this link to search all SAP messages.