Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 746
Message text: Order & operation &: Work center was changed manually
The operation was manually dispatched to work center &V4& or
rescheduled to it.
The operation was originally to be processed at the work center &V3& or
it was previously dispatched to the work center &V3&.
Error message extract from SAP system. Copyright SAP SE.
CY746
- Order & operation &: Work center was changed manually ?The SAP error message CY746 ("Order & operation &: Work center was changed manually") typically occurs in the context of production orders or operations within the SAP system, particularly in the Production Planning (PP) or Controlling (CO) modules. This error indicates that there has been a manual change to the work center assigned to a specific operation in a production order, which is not allowed under certain conditions.
Cause: Manual Changes: The work center for an operation was changed manually in the production order, which may conflict with the system's settings or the order's status. Status of the Order: The production order may be in a status that does not allow changes to the work center (e.g., if the order is already released or in process). Configuration Settings: There may be configuration settings in the system that restrict changes to work centers after certain actions have been taken on the order. Dependencies: The work center
Get instant SAP help. Sign up for our Free Essentials Plan.
CY745
Order & operation & suboperation &: No rem. available capacity available
What causes this issue? The system could not find any remaining available capacity within the planning period.How to fix this error? Increase the si...
CY744
Order & operation &: No remaining av. cap. available in planning period
What causes this issue? The system could not find any remaining available capacity within the planning period.How to fix this error? You have the fo...
CY747
Operation & sub-operation &: Work center was changed manually
What causes this issue? The sub-operation was manually dispatched to the work center &V4& or rescheduled to it. The sub-operation was origina...
CY748
Order & operation &: Start date limit exceeded
What causes this issue? Once the operation has been dispatched, the start date constraint is violated. Possible causes include: The constraint date f...