Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 747
Message text: Operation & sub-operation &: Work center was changed manually
The sub-operation was manually dispatched to the work center &V4& or
rescheduled to it.
The sub-operation was originally to be processed at the work center
&V3& or it was previously dispatched to the work center &V3&.
Error message extract from SAP system. Copyright SAP SE.
CY747
- Operation & sub-operation &: Work center was changed manually ?The SAP error message CY747 indicates that there has been a manual change to a work center that is associated with a specific operation and sub-operation in a production order or routing. This error typically arises in the context of production planning and control, where the system expects certain data to remain consistent for the integrity of the production process.
Cause: Manual Changes: The work center associated with the operation has been changed manually in the routing or production order, which can lead to inconsistencies in the data. Data Integrity Issues: The system may have constraints that prevent changes to work centers if certain conditions are not met, such as open production orders or dependencies on other operations.
Configuration Issues: There may be configuration settings in the system that restrict changes to work centers under certain circumstances.
Solution: Review Changes: Check the changes made to the work center. If the change was not intended, revert it
Get instant SAP help. Sign up for our Free Essentials Plan.
CY746
Order & operation &: Work center was changed manually
What causes this issue? The operation was manually dispatched to work center &V4& or rescheduled to it. The operation was originally to be pr...
CY745
Order & operation & suboperation &: No rem. available capacity available
What causes this issue? The system could not find any remaining available capacity within the planning period.How to fix this error? Increase the si...
CY748
Order & operation &: Start date limit exceeded
What causes this issue? Once the operation has been dispatched, the start date constraint is violated. Possible causes include: The constraint date f...
CY749
Order & operation &: Finish date limit exceeded
What causes this issue? Once the operation has been dispatched the finish date constraint is violated. Possible causes include: The constaint date fa...
Click on this link to search all SAP messages.