Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 725
Message text: & does not belong to resource network structure & in plant &
The header data of the process order specifies that the operations on
resource network structure &V2& are to be scheduled. However, the
operation has been assigned to a resource that does not belong to this
resource network structure.
Reschedule the operation to a resource in the resource network structure
&V2&, if necessary.
Error message extract from SAP system. Copyright SAP SE.
CY725
- & does not belong to resource network structure & in plant & ?The SAP error message CY725 typically indicates that there is an issue with the assignment of a resource to a network structure in the context of project management or production planning. This error can occur when a resource (such as a work center or a machine) is not properly linked to the network or when there are inconsistencies in the configuration.
Cause:
- Resource Not Assigned: The resource you are trying to use is not assigned to the specific network or project.
- Incorrect Plant Assignment: The resource may not be assigned to the correct plant or may not exist in the specified plant.
- Network Structure Issues: There may be issues with the network structure itself, such as missing or incorrect settings.
- Authorization Issues: The user may not have the necessary authorizations to access or modify the resource or network.
Solution:
Check Resource Assignment:
- Go to the network in question and verify that the resource is correctly assigned.
- Ensure that the resource is valid and exists in the system.
Verify Plant Assignment:
- Check if the resource is assigned to the correct plant. You can do this by navigating to the resource master data and confirming the plant assignment.
Review Network Structure:
- Inspect the network structure for any inconsistencies or missing elements. Ensure that all components are correctly configured.
Authorization Check:
- Ensure that the user has the necessary authorizations to access and modify the resource and network. This may require coordination with your SAP security team.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details related to the error message and its context.
SAP Notes:
- Check for any relevant SAP Notes that may address this specific error. Sometimes, there are known issues or patches that can resolve the problem.
Testing:
- After making the necessary adjustments, test the changes to ensure that the error no longer occurs.
Related Information:
CN21
(Create Network), CN22
(Change Network), or CR01
(Create Work Center) to manage networks and resources.By following these steps, you should be able to identify and resolve the issue related to the CY725 error message in SAP.
Get instant SAP help. Start your 7-day free trial now.
CY724
Order & operation & begins in the past
What causes this issue? The system is to dispatch an operation. The indicator <ZH>Indicator forwards</> is not set in the strategy profil...
CY723
Order & operation & lies outside float after production
What causes this issue? An operation is to be dispatched so that it lies outside the float after production. However, in the strategy profile in Cust...
CY726
& has no connection with predecessor & in res. netw. struct. & in plant &
What causes this issue? The header data of the process order specifies that the operations must be scheduled on a particular resource network structu...
CY727
& has no connection with successor & in res. netw. struct. & in plant &
What causes this issue? The header data of the process order specifies that the operations must be scheduled on a particular resource network structu...
Click on this link to search all SAP messages.