Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 724
Message text: Order & operation & begins in the past
The system is to dispatch an operation.
The indicator <ZH>Indicator forwards</> is not set in the
strategy profile in Customizing for Capacity Planning. That means that
the systems looks for a possible dispatch date in the <ZH>past</>.
The latest start that has been located lies in the past.
Either dispatch the operation manually or
select a strategy profile with the planning direction <ZH>forwards</>,
and dispatch the operation again.
Error message extract from SAP system. Copyright SAP SE.
CY724
- Order & operation & begins in the past ?The SAP error message CY724 ("Order & operation & begins in the past") typically occurs in the context of production planning and control when you are trying to schedule or process an operation in a production order that has a start date or time that is earlier than the current date and time. This can happen during various activities, such as confirming operations, creating production orders, or scheduling.
Cause:
- Incorrect Dates: The start date of the operation in the production order is set to a time in the past.
- System Date/Time Issues: The system date and time may not be correctly set, leading to discrepancies.
- Order Status: The production order may be in a status that does not allow for operations to be processed if they are scheduled in the past.
- Planning Parameters: The planning parameters or settings in the production order may not align with the current scheduling requirements.
Solution:
- Check Dates: Review the start and finish dates of the operation in the production order. If they are incorrect, update them to reflect the current or future dates.
- Adjust System Time: Ensure that the system date and time are correctly set. If there is a discrepancy, correct it.
- Change Order Status: If the order is in a status that prevents processing, consider changing the status or re-evaluating the order's scheduling.
- Re-schedule Operations: Use the scheduling functions in SAP to re-schedule the operations to ensure they fall within the acceptable time frame.
- Review Planning Parameters: Check the planning parameters and settings in the production order to ensure they are correctly configured.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
CY723
Order & operation & lies outside float after production
What causes this issue? An operation is to be dispatched so that it lies outside the float after production. However, in the strategy profile in Cust...
CY722
Order & operation & lies outside float before prod. + operation float
What causes this issue? An operation is to be dispatched so that it lies outside the float before production and the operation float. However in the ...
CY725
& does not belong to resource network structure & in plant &
What causes this issue? The header data of the process order specifies that the operations on resource network structure &V2& are to be sched...
CY726
& has no connection with predecessor & in res. netw. struct. & in plant &
What causes this issue? The header data of the process order specifies that the operations must be scheduled on a particular resource network structu...
Click on this link to search all SAP messages.