Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 723
Message text: Order & operation & lies outside float after production
An operation is to be dispatched so that it lies outside the float
after production. However, in the strategy profile in Customizing for
capacity planning the indicator <ZH>Use float aft. prod.</> is set.
This is used to specify that the planning result only counts as free
from error if the operation lies within the
float after production.
Either reschedule the operation or
reschedule another commitment to increase available capacity.
Error message extract from SAP system. Copyright SAP SE.
CY723
- Order & operation & lies outside float after production ?The SAP error message CY723 ("Order & operation & lies outside float after production") typically occurs in the context of production planning and control within the SAP system. This error indicates that there is a scheduling issue with a production order or operation, where the planned start or finish dates of the operation fall outside the allowable float time. Causes: Scheduling Conflicts: The operation's scheduled dates may conflict with the available float time, which is the amount of time that an operation can be delayed without affecting the overall project timeline. Incorrect Float Settings: The float settings for the production order or operation may not be configured correctly, leading to discrepancies in scheduling. Capacity Constraints: If there are capacity constraints on resources (machines, labor, etc.), it may lead to scheduling issues that cause operations to fall outside the allowable float. Changes in Production Plan: Any changes made to the production plan after the initial scheduling
Get instant SAP help. Sign up for our Free Essentials Plan.
CY722
Order & operation & lies outside float before prod. + operation float
What causes this issue? An operation is to be dispatched so that it lies outside the float before production and the operation float. However in the ...
CY721
Order & operation & lies outside operation float
What causes this issue? An operation is to be dispatched so that it lies outside the operation float. However, in the strategy profile in Customizing...
CY724
Order & operation & begins in the past
What causes this issue? The system is to dispatch an operation. The indicator <ZH>Indicator forwards</> is not set in the strategy profil...
CY725
& does not belong to resource network structure & in plant &
What causes this issue? The header data of the process order specifies that the operations on resource network structure &V2& are to be sched...
Click on this link to search all SAP messages.