How To Fix CY722 - Order & operation & lies outside float before prod. + operation float


CY722 - Overview

  • Message type: E = Error

  • Message class: CY - Capacity Requirements Planning

  • Message number: 722

  • Message text: Order & operation & lies outside float before prod. + operation float

  • Show details Hide details
  • What causes this issue?

    An operation is to be dispatched so that it lies outside the float
    before production and the operation float. However in the strategy
    profile in Customizing for capacity planning the indicator <ZH>Use
    float bef. prod.</> is set. This is used to specify that the planning
    result only counts as free from error if the operation lies within the
    operation float and the float before production.

    How to fix this error?

    Reschedule the operation if necessary or
    reschedule another commitment so as to increase available capacity.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CY722 - Order & operation & lies outside float before prod. + operation float ?
    The SAP error message CY722 indicates that there is an issue with the scheduling of an order and its operations in relation to the available float time. This error typically arises in the context of production planning and scheduling, particularly when using the Capacity Planning and Production Order Management modules.
    
    Cause: The error message CY722 occurs when: Order and Operation Scheduling: The scheduled start or finish time of an operation is outside the allowable float time defined for that operation. Float time refers to the amount of time that you can delay a task without affecting the overall project timeline. Capacity Constraints: There may be capacity constraints that prevent the operation from being scheduled within the available float. Incorrect Configuration: The configuration of the production order or the routing may not align with the available resources or time frames. Lead Times: The lead times defined for the operations may not be sufficient to accommodate the scheduling

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker