How To Fix CY445 - Planned order &: Rescheduling with production version was rejected


CY445 - Overview

  • Message type: E = Error

  • Message class: CY - Capacity Requirements Planning

  • Message number: 445

  • Message text: Planned order &: Rescheduling with production version was rejected

  • Show details Hide details
  • What causes this issue?

    If you have set the indicator <ls>Term.resched.with prod.version</> in
    the strategy profile then the rescheduling of operations in planned
    orders to another work center is terminated if the work center is not
    specified as the production line in a production version of the
    material.

    System Response

    The operation in the planned order is not rescheduled.

    How to fix this error?

    Deactivate the indicator <ls>Term.resched.with prod.version</> in the
    strategy profile.
    Deactivate the indicator <ls>Reschedule with production version</> in
    the strategy profile.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CY445 - Planned order &: Rescheduling with production version was rejected ?
    The SAP error message CY445, which states "Planned order &: Rescheduling with production version was rejected," typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that there was an issue with rescheduling a planned order that is linked to a production version.
    Causes:
    
    Production Version Issues: The production version associated with the planned order may not be valid or may not exist.
    Material Master Data: The material master data may not be correctly set up, particularly the production version or the relevant parameters.
    Capacity Constraints: There may be capacity constraints in the production resources that prevent the rescheduling of the planned order.
    Order Status: The status of the planned order may not allow for rescheduling (e.g., if it is already released or in process).
    Date Constraints: The dates associated with the planned order may not align with the production version's validity period.
    
    Solutions:
    
    Check Production Version: Verify that the production

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant