Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 444
Message text: Planned order & could not be rescheduled for the next line
Planned orders are scheduled with new production versions in the
following cases when dispatching or rescheduling:
<ls>Error handling when changing production version</> is activated in
the strategy profile.
If during automatic dispatching of operations in planned orders an
error (for example, a capacity overload) occurs then the planned order
is scheduled for the production line that is entered for the next
production version for the material.
<ls>Rescheduling with production version</> is activated in the
strategy profile.
When you reschedule an operation in a planned order to another
production line the planned order is rescheduled using the production
version for the material in which the new production line is specified.
The system found no production version. The possible causes include:
No valid production version exists.
The end of the production version list has been reached.
The operation in the planned order is not scheduled again or
rescheduled
Dispatch or reschedule the operation in the planned order.
Error message extract from SAP system. Copyright SAP SE.
CY444
- Planned order & could not be rescheduled for the next line ?The SAP error message CY444 ("Planned order & could not be rescheduled for the next line") typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the system is unable to reschedule a planned order due to various reasons, which can include constraints in capacity, material availability, or scheduling conflicts. Causes of Error CY444 Capacity Constraints: The work center may not have enough capacity available to accommodate the planned order. This can happen if there are other orders scheduled at the same time. Material Availability: If the materials required for the planned order are not available or are not scheduled to be available in time, the system may prevent rescheduling. Scheduling Conflicts: There may be other orders or activities that conflict with the planned order's scheduling, leading to the inability to reschedule. Production Version Issues: If the production version associated with the planned order is not valid
Get instant SAP help. Sign up for our Free Essentials Plan.
CY443
Planned order & was rescheduled using the next production version
What causes this issue? The system could not dispatch the planned order to the production line originally intended for it. A possible cause is, for e...
CY442
No planned orders with valid production versions exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY445
Planned order &: Rescheduling with production version was rejected
What causes this issue? If you have set the indicator <ls>Term.resched.with prod.version</> in the strategy profile then the rescheduling...
CY446
Change production version on error was not executed
What causes this issue? In the strategy profile, the planning functions <ZH> <ZK>setup time optimization</></> and <ZH>...