How To Fix CY444 - Planned order & could not be rescheduled for the next line


CY444 - Overview

  • Message type: E = Error

  • Message class: CY - Capacity Requirements Planning

  • Message number: 444

  • Message text: Planned order & could not be rescheduled for the next line

  • Show details Hide details
  • What causes this issue?

    Planned orders are scheduled with new production versions in the
    following cases when dispatching or rescheduling:
    <ls>Error handling when changing production version</> is activated in
    the strategy profile.
    If during automatic dispatching of operations in planned orders an
    error (for example, a capacity overload) occurs then the planned order
    is scheduled for the production line that is entered for the next
    production version for the material.
    <ls>Rescheduling with production version</> is activated in the
    strategy profile.
    When you reschedule an operation in a planned order to another
    production line the planned order is rescheduled using the production
    version for the material in which the new production line is specified.
    The system found no production version. The possible causes include:
    No valid production version exists.
    The end of the production version list has been reached.

    System Response

    The operation in the planned order is not scheduled again or
    rescheduled

    How to fix this error?

    Dispatch or reschedule the operation in the planned order.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CY444 - Planned order & could not be rescheduled for the next line ?
    The SAP error message CY444 ("Planned order & could not be rescheduled for the next line") typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the system is unable to reschedule a planned order due to various reasons, which can include constraints in capacity, material availability, or scheduling conflicts.
    Causes of Error CY444
    
    
    Capacity Constraints: The work center may not have enough capacity available to accommodate the planned order. This can happen if there are other orders scheduled at the same time.
    
    
    Material Availability: If the materials required for the planned order are not available or are not scheduled to be available in time, the system may prevent rescheduling.
    
    
    Scheduling Conflicts: There may be other orders or activities that conflict with the planned order's scheduling, leading to the inability to reschedule.
    
    
    Production Version Issues: If the production version associated with the planned order is not valid

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker