Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 450
Message text: Planned order &1 operation &2 were deleted on rescheduling
If you dispatch, reschedule or deallocate a planned order the system
reschedules it. It reads in the new routing to do this.
One of the following problems has probably arisen while the routing was
being read in or during scheduling:
The planned order was now scheduled using different scheduling
parameters.
No valid routing was found.
The operation does not exist in the valid routing.
The original operation and the capacity requirements belonging to it
were deleted.
Check the scheduling parameters and the routing.
Error message extract from SAP system. Copyright SAP SE.
CY450
- Planned order &1 operation &2 were deleted on rescheduling ?The SAP error message CY450 indicates that a planned order operation has been deleted during the rescheduling process. This can occur for various reasons, and understanding the cause and finding a solution is essential for effective production planning.
Cause: Changes in Demand: If the demand for a product changes, it may lead to the deletion of planned orders that are no longer necessary. Capacity Constraints: If there are capacity issues or constraints in the production process, the system may delete planned orders to optimize scheduling. Order Modifications: Changes made to the production order or planned order, such as changes in routing or bill of materials, can lead to the deletion of operations. Rescheduling Parameters: The parameters set for rescheduling may be too strict, causing the system to delete operations that do not meet the new criteria. Material Availability: If materials required for the planned order are not available, the system may delete the order or its
Get instant SAP help. Sign up for our Free Essentials Plan.
CY446
Change production version on error was not executed
What causes this issue? In the strategy profile, the planning functions <ZH> <ZK>setup time optimization</></> and <ZH>...
CY445
Planned order &: Rescheduling with production version was rejected
What causes this issue? If you have set the indicator <ls>Term.resched.with prod.version</> in the strategy profile then the rescheduling...
CY451
Changes cannot be made to planned orders for planned independent reqmts
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY452
Changes cannot be made to directly produced planned orders
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.