Message type: E = Error
Message class: CRM_PS_ELD - Messages from Eligibility Determination
Message number: 213
Message text: Overlap of '&1' eligibility periods starts on &2 and ends on &3 &4
The consistency check has detected one or multiple error(s) caused by
existing overlapping eligibility periods. An overlap of eligibility
periods defined manually or those determined automatically is not
allowed.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you have overlapping eligibility periods that were determined
automatically, contact your system administrator.
If you have overlapping eligibility periods that were defined manually,
check your entries.
Check the eligibility determination in your corresponding BRFplus rule
or in the active BAdI implementation of <NP>CRM_PS_ELD_BADI</>.
Error message extract from SAP system. Copyright SAP SE.
CRM_PS_ELD213
- Overlap of '&1' eligibility periods starts on &2 and ends on &3 &4 ?The SAP error message CRM_PS_ELD213 indicates that there is an overlap in eligibility periods for a specific item or service in the SAP CRM system. This typically occurs when you are trying to create or modify an eligibility period for a product or service that conflicts with an existing eligibility period.
Cause: The error message is triggered when: You attempt to create or modify an eligibility period that overlaps with an existing eligibility period for the same product or service. The start and end dates of the new eligibility period fall within the range of an already defined eligibility period.
Solution: To resolve this error, you can take the following steps: Check Existing Eligibility Periods: Review the existing eligibility periods for the product or service in question. You can do this by navigating to the relevant transaction or report in SAP that displays eligibility periods. Adjust Dates: If you find that the new eligibility period overlaps with an existing one,
Get instant SAP help. Sign up for our Free Essentials Plan.
CRM_PS_ELD212
Eligibility period gap of &1 day(s) has been detected: &2 - &3 &4
What causes this issue? Process consistency check has detected one or multiple error(s) during the eligibility determination (validity check).System ...
CRM_PS_ELD211
Eligibility period from &1 - &2 does not match decision period &3 - &4
What causes this issue? Process consistency check has detected one or multiple error(s) during eligiblity determination (validity check)System Respon...
CRM_PS_ELD214
Determination of eligibility periods failed
What causes this issue? The determination of automatic eligibility periods (using a BRFplus rule or BAdI implementation) or the definition of manual ...
CRM_PS_ELD215
No decision unit assigned to eligibility period &1 - &2
What causes this issue? The eligibility period &V1& - &V2& must be assigned to an existing decision unit.System Response The system ...
Click on this link to search all SAP messages.