Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CKBK - Messages of the Valuation Functions
Message number: 037
Message text: Costing item &3 is not valuated with cost component split
It is not possible to transfer the cost component split of cost
component structure &v1& to the cost component structure &v2&.
Costing item &v3& is not valuated with a cost component split.
Check the transfer structure of &v1& to &v2& in Customizing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CKBK037
- Costing item &3 is not valuated with cost component split ?The SAP error message CKBK037 indicates that a costing item is not valuated with a cost component split. This typically occurs during the costing process when the system expects a detailed breakdown of costs into components (like material costs, labor costs, overheads, etc.), but the relevant data is not available or not configured correctly.
Cause:
- Missing Cost Component Split: The cost component split may not be defined for the material or the costing item in question.
- Incorrect Configuration: The configuration settings for cost component splits in the controlling area or the material master may not be set up correctly.
- Costing Variant Issues: The costing variant being used may not be configured to allow for cost component splits.
- Material Master Data: The material master data may not have the necessary information for cost component splitting.
Solution:
Check Cost Component Split Configuration:
- Go to the configuration settings in SAP (Transaction code: SPRO).
- Navigate to Controlling -> Product Cost Controlling -> Cost Object Controlling -> Define Cost Component Split.
- Ensure that the cost component split is defined correctly for the relevant costing items.
Review Costing Variant:
- Check the costing variant being used (Transaction code: OKKN).
- Ensure that the costing variant is set up to allow for cost component splits.
Material Master Data:
- Check the material master data (Transaction code: MM03).
- Ensure that the costing views are properly maintained and that the cost component split is defined.
Re-run the Costing:
- After making the necessary adjustments, re-run the costing process to see if the error persists.
Consult Documentation: If the issue continues, refer to SAP documentation or consult with your SAP support team for further assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the CKBK037 error and implement the necessary solutions to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
CKBK036
Costing period from &1 to &2 is not valid
What causes this issue? The cost estimate contains a sub-costing having a validity period from &v3& to &v4& which does not fall withi...
CKBK035
Distribution period of the costs from &1 to &2 is invalid
What causes this issue? The distribution period from &v1& to &v2& for the costs of the costing item does not fall within the validity...
CKBK038
Transfer cost component split/primary cost component split
What causes this issue? When you valuate costing item &v3& the referenced cost component split (cost component structure &v1&) is tra...
CKBK039
Automatic account assignment determines invalid cost element &
What causes this issue? Automatic account assignment determines consumption account &v1&. This account is invalid in company code &v4&...
Click on this link to search all SAP messages.