Message type: E = Error
Message class: CKBK - Messages of the Valuation Functions
Message number: 036
Message text: Costing period from &1 to &2 is not valid
The cost estimate contains a sub-costing having a validity period from
&v3& to &v4& which does not fall within the validity period for this
cost estimate from &v1& to &v2&.
The validity period is not changed.
First change the validity period of the sub-costing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CKBK036
- Costing period from &1 to &2 is not valid ?The SAP error message CKBK036 indicates that the costing period specified in a transaction is not valid. This typically occurs when the costing period you are trying to use is either closed or does not exist in the system. Here’s a breakdown of the cause, potential solutions, and related information for this error:
Cause: Closed Period: The costing period you are trying to access has been closed for posting. In SAP, periods can be closed for various reasons, such as month-end or year-end closing activities. Non-existent Period: The period you are trying to use may not exist in the system. This can happen if the period has not been defined in the controlling area or if there is a mismatch in the period settings. Incorrect Date Range: The date range specified in the transaction may not align with the defined costing periods in the system.
Configuration Issues: There may be configuration issues in the controlling
Get instant SAP help. Sign up for our Free Essentials Plan.
CKBK035
Distribution period of the costs from &1 to &2 is invalid
What causes this issue? The distribution period from &v1& to &v2& for the costs of the costing item does not fall within the validity...
CKBK034
Costing period from &1 to &2 is invalid
What causes this issue? The validity period of the costing from &v1& to &v2& must fall within the validity period from &v3& t...
CKBK037
Costing item &3 is not valuated with cost component split
What causes this issue? It is not possible to transfer the cost component split of cost component structure &v1& to the cost component struct...
CKBK038
Transfer cost component split/primary cost component split
What causes this issue? When you valuate costing item &v3& the referenced cost component split (cost component structure &v1&) is tra...
Click on this link to search all SAP messages.