Do you have any question about this error?
Message type: E = Error
Message class: CKBK - Messages of the Valuation Functions
Message number: 035
Message text: Distribution period of the costs from &1 to &2 is invalid
The distribution period from &v1& to &v2& for the costs of the costing
item does not fall within the validity period from &v3& to &v4& for the
costing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Either change the distribution period of the costing item costs or the
validity period of the costing. You should change the start date under
<LS>valuation date</>. Note: through such a change the price
determination may be changed, therefore you are recommended to carry
out a new costing using the new valuation date. You can change the end
date under <LS>latest end date</>.
Error message extract from SAP system. Copyright SAP SE.
CKBK035
- Distribution period of the costs from &1 to &2 is invalid ?The SAP error message CKBK035 indicates that there is an issue with the distribution period of costs in a cost allocation or distribution process. Specifically, it means that the specified distribution period (from &1 to &2) is invalid, which can occur for several reasons.
Cause:
- Invalid Periods: The periods specified in the error message may not exist in the system. This can happen if the periods are closed or if the fiscal year variant does not include those periods.
- Incorrect Configuration: The configuration for the cost distribution may not align with the periods defined in the controlling area or fiscal year variant.
- Posting Restrictions: There may be restrictions on posting to certain periods due to settings in the controlling area or financial accounting.
- Data Entry Errors: There could be a mistake in the data entry where the periods were incorrectly specified.
Solution:
- Check Periods: Verify that the periods specified in the error message are valid and open for posting. You can do this by checking the period status in the controlling area.
- Review Configuration: Ensure that the configuration for cost distribution aligns with the fiscal year variant and that the periods are correctly defined.
- Adjust Posting Restrictions: If there are restrictions on posting to certain periods, consider adjusting these settings if appropriate.
- Correct Data Entry: If the periods were entered incorrectly, correct the data entry to specify valid periods.
- Consult Documentation: Review SAP documentation or consult with your SAP support team for specific guidance related to your configuration and setup.
Related Information:
OKB9
(for cost center distribution) or KSV5
(for distribution of costs) to review and adjust settings.If the issue persists after checking these areas, it may be beneficial to engage with your SAP support team or consult the SAP community for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CKBK034
Costing period from &1 to &2 is invalid
What causes this issue? The validity period of the costing from &v1& to &v2& must fall within the validity period from &v3& t...
CKBK033
Partner number for partner version &1 could not be determined
What causes this issue? When you want to determine the partner number you need organizational units that you find are not contained in the data of th...
CKBK036
Costing period from &1 to &2 is not valid
What causes this issue? The cost estimate contains a sub-costing having a validity period from &v3& to &v4& which does not fall withi...
CKBK037
Costing item &3 is not valuated with cost component split
What causes this issue? It is not possible to transfer the cost component split of cost component structure &v1& to the cost component struct...
Click on this link to search all SAP messages.