Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 725
Message text: Quantity structure type was changed between selection and explosion
Between selecting a costing run and exploding the structure, the
Customizing settings for a <DS:GLOS.mixed_costing>mixed cost
estimate</> were changed. The selection process uses quantity structure
category &V1&, while the structure explosion uses quantity structure
category &V2&.
The structure cannot be exploded.
Change the settings for mixed costing in Customizing or start selection
again.
Error message extract from SAP system. Copyright SAP SE.
CK725
- Quantity structure type was changed between selection and explosion ?The SAP error message CK725, which states "Quantity structure type was changed between selection and explosion," typically occurs in the context of product costing and material valuation in SAP. This error indicates that there is a mismatch in the quantity structure type of a material when the system attempts to explode a bill of materials (BOM) during the costing process.
Cause: The error can be caused by several factors, including: Changes in BOM or Routing: If the BOM or routing for a material has been changed after the initial selection but before the explosion, it can lead to inconsistencies in the quantity structure type. Different Quantity Structures: The system may be trying to use different quantity structures (e.g., different units of measure or different types of quantity calculations) for the same material, which can lead to confusion during the costing process. Master Data Issues: Inconsistencies in the master data, such as material master records or
Get instant SAP help. Sign up for our Free Essentials Plan.
CK724
Standard value w/o activity type exists in operation &1/suboperation &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK723
Costing of cycle & does not converge
What causes this issue? Iterative costing of the materials in cycle &v1& does not converge at all or does not converge within 500 iteration s...
CK726
Qty structure type was changed between selection/explosion and costing
What causes this issue? Between selection/structure explosion of a costing run and costing, or between two costing phases, the Customizing settings f...
CK727
Lot size cannot be passed on in combination with mixed costing
What causes this issue? For <DS:GLOS.costing_variant>costing variant</> &V1& and <DS:GLOS.costing_version>costing version&l...
Click on this link to search all SAP messages.