Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 725
Message text: Quantity structure type was changed between selection and explosion
Between selecting a costing run and exploding the structure, the
Customizing settings for a <DS:GLOS.mixed_costing>mixed cost
estimate</> were changed. The selection process uses quantity structure
category &V1&, while the structure explosion uses quantity structure
category &V2&.
The structure cannot be exploded.
Change the settings for mixed costing in Customizing or start selection
again.
Error message extract from SAP system. Copyright SAP SE.
CK725
- Quantity structure type was changed between selection and explosion ?The SAP error message CK725, which states "Quantity structure type was changed between selection and explosion," typically occurs in the context of product costing and material valuation in SAP. This error indicates that there is a mismatch in the quantity structure type of a material when the system attempts to explode a bill of materials (BOM) during the costing process.
Cause:
The error can be caused by several factors, including:
Changes in BOM or Routing: If the BOM or routing for a material has been changed after the initial selection but before the explosion, it can lead to inconsistencies in the quantity structure type.
Different Quantity Structures: The system may be trying to use different quantity structures (e.g., different units of measure or different types of quantity calculations) for the same material, which can lead to confusion during the costing process.
Master Data Issues: Inconsistencies in the master data, such as material master records or BOMs, can also trigger this error.
Configuration Changes: Changes in configuration settings related to costing or material management can lead to this error if they affect how quantities are calculated or structured.
Solution:
To resolve the CK725 error, you can take the following steps:
Check BOM and Routing: Review the BOM and routing for the material in question to ensure that there have been no changes that could affect the quantity structure. If changes were made, ensure they are consistent and correctly configured.
Recheck Material Master Data: Verify the material master data for the affected material. Ensure that the quantity structure type is consistent across all relevant views (e.g., basic data, purchasing, accounting).
Consistency Check: Use transaction codes like CK11N (Create Cost Estimate with Quantity Structure) or CK24 (Display Cost Estimate) to check for inconsistencies in the cost estimate. You can also use transaction CK40N to analyze the cost estimate and see where the issue might be arising.
Recreate Cost Estimate: If the cost estimate is corrupted or inconsistent, you may need to recreate it. This can be done by deleting the existing cost estimate and creating a new one.
Consult Documentation: Review SAP documentation or notes related to this error message for any specific recommendations or patches that may address the issue.
Contact SAP Support: If the issue persists and you cannot identify the cause, consider reaching out to SAP support for further assistance. They may provide insights based on the specific configuration and version of your SAP system.
Related Information:
By following these steps, you should be able to identify and resolve the underlying cause of the CK725 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
CK724
Standard value w/o activity type exists in operation &1/suboperation &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK723
Costing of cycle & does not converge
What causes this issue? Iterative costing of the materials in cycle &v1& does not converge at all or does not converge within 500 iteration s...
CK726
Qty structure type was changed between selection/explosion and costing
What causes this issue? Between selection/structure explosion of a costing run and costing, or between two costing phases, the Customizing settings f...
CK727
Lot size cannot be passed on in combination with mixed costing
What causes this issue? For <DS:GLOS.costing_variant>costing variant</> &V1& and <DS:GLOS.costing_version>costing version&l...
Click on this link to search all SAP messages.