How To Fix CK724 - Standard value w/o activity type exists in operation &1/suboperation &2


CK724 - Overview

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 724

  • Message text: Standard value w/o activity type exists in operation &1/suboperation &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CK724 - Standard value w/o activity type exists in operation &1/suboperation &2 ?
    The SAP error message CK724 indicates that there is a standard value defined for an operation or suboperation in a routing that does not have an associated activity type. This typically occurs in the context of production planning and controlling, particularly when working with routings and work centers.
    
    Cause: Missing Activity Type: The operation or suboperation in the routing is defined with a standard value, but there is no corresponding activity type assigned to it. Activity types are necessary for cost calculation and resource planning. Incorrect Configuration: The configuration of the work center or routing may be incomplete or incorrect, leading to the absence of the required activity type. Data Inconsistency: There may be inconsistencies in the master data, such as the work center or routing not being properly maintained.
    Solution: Check Routing: Go to the routing in question and verify that the operation/suboperation has a valid activity type assigned. You can do this by navigating

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author